Coombe Farm Westfield Avenue North Saltdean Brighton BN2 8HP
Non-Material Amendment to BH2020/00002 to amend the wording of Condition 9, so that the final paragraph of Condition 9 states: the approved scheme shall be implemented prior to first occupation of 60% of the residential development (43 homes) and shall include the implementation of the recommendations of the stage 3 Road Safety Audit, with the Highway Authority acting as Overseeing organisation. Thereafter the approved scheme shall be retained in use at all times, except that a further stage 4 Road Safety Audit shall be undertaken if any road traffic collisions are recorded within the 12 months of validated collision data available after scheme opening and the recommendations of that shall be implemented.
The Old Ship Hotel 31 - 38 Kings Road Brighton BN1 1NR
Non-Material Amendment to BH2022/02711 to amend the wording of Condition 23 to "Within 6 months of first occupation of the non-residential development hereby permitted a BREEAM Building Research Establishment has issued a Post Construction Review Certificate confirming that the new-build and refurbished development combined has achieved a minimum BREEAM rating of 'Excellent' and such certificate has been submitted to, and approved in writing by, the Local Planning Authority."
11-12 Rock Place Brighton BN2 1PF
Non-Material Amendment to application BH2020/01505 to replace co-working office space on first floor with four additional residential units.
19-24 Melbourne Street Brighton BN2 3LH
Non-Material Amendment to BH2019/01820 to amend the description to 'Demolition of existing auto servicing centre and joinery building and erection of a new development of 4 and 6 storeys, plus basement level, comprising coworking business floor space (B1) including gym/community space and ancillary café. Provision of co-living residential units (Sui Generis) with ancillary storage, landscaped residents roof terrace and access, together with cycle storage, associated plant and electrical sub-stations and associated works. (Revisions to loading bay arrangements and cycle storage)'.
The Meeting House Park Close Brighton BN1 9AJ
Non-material amendment to application BH2020/01742, amended by BH2021/02701 to permit alterations to the front hard landscaped/parking area and addition of solar panels and 2no rooflights to rear of each residential block.
Kings House Grand Avenue Hove BN3 2LS
Non-material amendment to application BH2018/00868 to amend description of development to read: Demolition of existing office building (B1) fronting Grand Avenue. Conversion of existing (B1) building fronting Queens Gardens to residential dwellings (C3) with associated alterations and extensions. Erection of a 10 storey building over basement carpark comprising of residential flats (C3) on Grand Avenue and erection of a 6 storey building comprising of residential flats (C3) on Second Avenue. Associated underground parking, landscaping, cycle storage, bins and recycling points.
Preston Barracks, Mithras House, Watts Building Lewes Road Brighton BN2 4GL
Non Material Amendment to planning permission ref: BH2019/00628 to amend roof edge protection and changes to window openings in respect of residential Buildings B and E.
Former Amex House Edward Street Brighton BN88 1AH
Non-material amendment to application BH2018/00340 to amend appearance of west elevation of Block F to correspond with approved artwork strategy and amendment to wording of condition 30 to i) amend the trigger for the requirement for BREEAM Post-Construction Review Certificate and ii) introduce phasing to enable the certificate to be submitted on completion of each non-residential block.
8 Lloyd Road Hove BN3 6NL
Non-material amendment to application BH2017/04070 to amend description to: Demolition of garage and erection of residential dwelling (C3) to rear and associated alterations.
The Astoria 10 - 14 Gloucester Place Brighton BN1 4AA
Non-material amendment to BH2015/01471 (see original description) as amended by applications BH2017/04022, BH2019/00199, BH2020/01841 and BH2020/02507, to amend wording of condition 24 to allow a BREEAM Certificate to be issued 6 months post occupation of the non-residential development.