Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(i) - Tree and Hedgerow Protection Strategy and Requirement 12 - retention and protection of existing trees and hedgerows for Stage 5 (MAJOR REQUIREMENT) of the authorised development - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near A vonmouth, comprising: - Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
The Park Daventry Road Bristol BS4 1DQ
Application for approval of details reserved by conditions 4 (Protection of Retained Trees) and 5 (Arboricultural Supervision) of permission 19/04881/P (Hybrid application for development of the site comprising, with phased development: Erection of buildings for mixed community use (including D1, D2, B1, A3), extension to retained sports hall, and associated works and infrastructure (full details); Erection of new secondary school (D1) and associated works and infrastructure including MUGA (outline with all matters reserved apart from Access). Major