Meadow Vale Community Centre Meadow Vale Bristol BS5 7RF
Application for the variation & removal of conditions 11 (contamination) & 12 (list of plans) of planning permission 20/05207/F Proposed extension, to provide a new leisure multi-purpose hall, including a level walkway for disabled access to the new extension a new gate onto the side footpath and provision of bike/bin storage and car parking - now proposed to discharge condition 11 (Contamination) and amend condition 12 (Approved Plans), with revised site layout.
3 Vauxhall Avenue Bristol BS3 1SU
Application for the discharge of condition 2 (Driveway materials) and variation of condition 8 (Approved plans), following grant of planning permission 17/01538/F for an extension to existing terrace to provide 2no. self-contained flats (Use Class C3) - now proposed replacement and addition of plans and elevations (drawing nos. P1 Rev A and P2 Rev A).
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(h) of the DCO (Archaeological Method Statement for trial trenching (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(c) of the DCO (Pollution Incident Control Plan (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(i) - Tree and Hedgerow Protection Strategy and Requirement 12 - retention and protection of existing trees and hedgerows for Stage 5 (MAJOR REQUIREMENT) of the authorised development - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near A vonmouth, comprising: - Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.