Wessex Water Authority Kings Weston Lane Avonmouth Bristol BS11 0YS
Request for a Scoping Opinion as to whether an Environmental Impact Assessment is required for the proposed extension to Bristol's Water Recycling Centre (WRC). (Please note that this is not a planning application and therefore we are not carrying out public consultation on the proposal at this stage).
1 Milsom Street Bristol BS5 0SS
Enforcement notice appeal for the erection of rear extension without planning permission.
15 Bridge Street Eastville Bristol BS5 6LN
Enforcement notice appeal for the erection of a two storey rear extension with door access onto the roof from first floor level to rear without planning permission.
Land Rear Of 100 Temple Street Redcliff Bristol BS1 6AG
Application for the extension of working hours conditioned following grant of application 18/05044/F for the demolition of squash courts and rear external access lobby relating to 100 Temple Street. Re-development of site to provide a six storey office building (use class B1) with associated car and cycle parking provision; refuse and recycling areas; plant and service areas; a landscaped square.
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(h) of the DCO (Archaeological Method Statement for trial trenching (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(c) of the DCO (Pollution Incident Control Plan (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Hillside Lower Conham Vale Hanham Bristol BS15 3AY
Request for comments by Bristol City Council on an application that crosses the boundary into an adjoining authority: - Demolition of garage. Erection of two storey rear extension to facilitate subdivision of 1 no dwelling into 3 no. dwellings with associated works.
Hinkley Point C Connection Project Severn Road Avonmouth Bristol
National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(i) - Tree and Hedgerow Protection Strategy and Requirement 12 - retention and protection of existing trees and hedgerows for Stage 5 (MAJOR REQUIREMENT) of the authorised development - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near A vonmouth, comprising: - Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
1 Green Street Bristol BS3 4UA
Application for the extension of time following grant of planning application 17/02060/F for the erection of two storey dwelling house.
83 Stonebridge Park Bristol BS5 6RN
Enforcement notice appeals for extension works to rear (balcony and access steps to rear garden) not in accordance with plans approved as part of planning permission 19/00076/H.