Bristol City Council Planning Applications

Found 13 planning applications

22/04940/SCO | Scoping Opinion

Wessex Water Authority Kings Weston Lane Avonmouth Bristol BS11 0YS

Request for a Scoping Opinion as to whether an Environmental Impact Assessment is required for the proposed extension to Bristol's Water Recycling Centre (WRC). (Please note that this is not a planning application and therefore we are not carrying out public consultation on the proposal at this stage).

Local Authority
Bristol City Council
Type
Other (Scoping Opinion)
Decision
(Scoping Opinion complete)
Application Received
06/10/2022
Application Validated
06/10/2022
Extension
21/02920/Z | Enforcement Notice Appeal

1 Milsom Street Bristol BS5 0SS

Enforcement notice appeal for the erection of rear extension without planning permission.

Local Authority
Bristol City Council
Type
Other (Enforcement Notice Appeal)
Decision
(Appeal against Enforcement Notice)
Application Received
24/05/2021
Application Validated
24/05/2021
Extension Erection
20/05784/Z | Enforcement Notice Appeal

15 Bridge Street Eastville Bristol BS5 6LN

Enforcement notice appeal for the erection of a two storey rear extension with door access onto the roof from first floor level to rear without planning permission.

Local Authority
Bristol City Council
Type
Other (Enforcement Notice Appeal)
Decision
(Appeal against Enforcement Notice)
Application Received
01/12/2020
Application Validated
01/12/2020
Extension Erection Roof
21/00520/FLX | Notification of flexible use

Land Rear Of 100 Temple Street Redcliff Bristol BS1 6AG

Application for the extension of working hours conditioned following grant of application 18/05044/F for the demolition of squash courts and rear external access lobby relating to 100 Temple Street. Re-development of site to provide a six storey office building (use class B1) with associated car and cycle parking provision; refuse and recycling areas; plant and service areas; a landscaped square.

Local Authority
Bristol City Council
Type
Other (Notification of flexible use)
Decision
Approved (Development permitted)
Application Received
29/01/2021
Application Validated
29/01/2021
Extension Demolition Development Office
20/05092/REQU | Requirement for Development Order

Hinkley Point C Connection Project Severn Road Avonmouth Bristol

National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(h) of the DCO (Archaeological Method Statement for trial trenching (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.

Local Authority
Bristol City Council
Type
Other (Requirement for Development Order)
Decision
(Condition application decided)
Application Received
26/10/2020
Application Validated
26/10/2020
Extension Construction Development Discharge
20/05786/REQU | Requirement for Development Order

Hinkley Point C Connection Project Severn Road Avonmouth Bristol

National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(c) of the DCO (Pollution Incident Control Plan (MAJOR REQUIREMENT)) of Stage 10.1 of the authorised development. - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.

Local Authority
Bristol City Council
Type
Other (Requirement for Development Order)
Decision
(Condition application decided)
Application Received
01/12/2020
Application Validated
01/12/2020
Extension Construction Development Discharge
21/00273/K | Other Consultations

Hillside Lower Conham Vale Hanham Bristol BS15 3AY

Request for comments by Bristol City Council on an application that crosses the boundary into an adjoining authority: - Demolition of garage. Erection of two storey rear extension to facilitate subdivision of 1 no dwelling into 3 no. dwellings with associated works.

Local Authority
Bristol City Council
Type
Other (Other Consultations)
Decision
Approved (NO OBJECTIONS are raised)
Application Received
19/01/2021
Application Validated
19/01/2021
Extension Erection Demolition Dwelling Garage Boundary
20/05300/REQU | Requirement for Development Order

Hinkley Point C Connection Project Severn Road Avonmouth Bristol

National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) (the DCO) - Formal submission to discharge Requirement 6(1)(i) - Tree and Hedgerow Protection Strategy and Requirement 12 - retention and protection of existing trees and hedgerows for Stage 5 (MAJOR REQUIREMENT) of the authorised development - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near A vonmouth, comprising: - Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.

Local Authority
Bristol City Council
Type
Other (Requirement for Development Order)
Decision
(Condition application decided)
Application Received
06/11/2020
Application Validated
06/11/2020
Extension Construction Development Discharge Trees
20/05098/RC | Extension of time limit (s.93A)

1 Green Street Bristol BS3 4UA

Application for the extension of time following grant of planning application 17/02060/F for the erection of two storey dwelling house.

Local Authority
Bristol City Council
Type
Other (Extension of time limit (s.93A))
Decision
Approved (Additional Environ. Approval Granted)
Application Received
26/10/2020
Application Validated
26/10/2020
Extension Erection Dwelling House
20/02912/Z | Enforcement Notice Appeal

83 Stonebridge Park Bristol BS5 6RN

Enforcement notice appeals for extension works to rear (balcony and access steps to rear garden) not in accordance with plans approved as part of planning permission 19/00076/H.

Local Authority
Bristol City Council
Type
Other (Enforcement Notice Appeal)
Decision
(Appeal against Enforcement Notice)
Application Received
03/07/2020
Application Validated
03/07/2020
Extension