LPG Storage Facility And Pipeline Severn Road Avonmouth Bristol
Application for Outline Planning Permission with approval sought for Landscape and access. All other matters reserved. - Construction of a twin pipeline to enable the transfer of liquid gas by pipeline rather than road from the Oil Basin at Avonmouth Docks (Port of Bristol) to the Gas Terminal at Hallen for subsequent storage and distribution. Construction of two marine loading arms and a control kiosk at the Oil Basin in Avonmouth Docks to enable sea-going tankers to be unloaded, and engineering apparatus and pipework at the Avonmouth Gas Terminal, including two additional loading bays for road tankers, and associated infrastructure. Application to be read in conjunction with South Glos Council planning application P21/05941/O.