167 Whiteladies Road Clifton Bristol BS8 2SQ
Variation of condition 6 (List of approved plans) of permission 22/03946/LA -Replacement roof to front commercial space, conversion of upper floors to 3no. Class C3 dwellings and associated internal and external alterations. Amendment sought for changes to the ground floor.
167 Whiteladies Road Clifton Bristol BS8 2SQ
Application for variation of condition 17(List of approved plans and drawings) of permission 22/03945/F - Replacement roof to front commercial space, conversion of upper floors to 3no. Class C3 dwellings and associated internal and external alterations. Amendment sought for changes to ground floor.
47 Jubilee Road Knowle Bristol BS4 2LR
Application for variation of condition nos 6 (External works to match)and 7(List of approved plans) following grant of planning permission ref. 18/01463/F for the conversion of a single dwellinghouse (Use Class C3) into 2 x 1-bed, self-contained flats (Use Class C3) With 3 storey extension to rear. Amendment to facing materials and roof slope.
Former Elizabeth Shaw Factory Greenbank Road Easton Bristol BS5 6EL
Application for a non-material amendment following grant of planning permission 18/00590/X for variation of condition numbers 8 (Ecological mitigation strategy) & 34 (Limitation of Uses) attached to planning permission 15/06400/F (Granted on appeal reference APP/Z0116/W/17/3166851) for mixed use development comprising conversion of existing remaining buildings (labelled Blocks C, D and F) and erection of new buildings to provide: 135 dwellings (91 apartments; 44 houses) (Blocks A, B, D, E, F, G and terraces); 485 sq m Class B1 floorspace (Block D); 726 sq m of commercial floorspace (Use Class B1/A1/A2) (Blocks B and C); 332 sq m of flexible community/business/health/leisure floorspace (Class B1/D1/D2) (Block C); 412 sq m flexible Class A3 or A4 floorspace (Block D); and associated accesses including a new pedestrian/cycle link onto the Railway Path, parking and landscaping. (Major Application) - now proposed amendments to allow the development to be completed and occupied in phases.