47 Shirehampton Road Stoke Bishop Bristol BS9 2DN
Demolition of existing conservatory and partial demolition of existing garage. Construction of new garage space with home office space over and new dormer to rear roof.
47 Shirehampton Road Stoke Bishop Bristol BS9 2DN
Demolition of existing conservatory and partial demolition of existing garage. Construction of new garage space with home office space over and new dormer to rear roof.
19 Camp Road Bristol BS8 3LW
Demolition of front porch and ancillary rooms and construction of single-storey entrance porch, WC, Utility Room and garage. Reconstruction of low-pitch roof over single-storey south annex with new tiled pitched roof. Clad parts of existing house with insulated render. Replace single-glazed metal windows with double-glazed hardwood windows. Modify existing driveway to suit garage and provide new planting scheme.
Land Bounded By Winterstoke Road, Luckwell Road Winterstoke Centre Lynwood Road Bristol BS3 3HH
Application for a non-material amendment following grant of planning permission 19/04212/X for an application to vary condition numbers 3 (Highway Works) and 34 (Approved Plans) attached to planning permission 18/02302/F - Demolition of all existing buildings, and the erection of buildings to facilitate 67 residential dwelling units consisting of 8 terraced houses and 59 flats, external landscaping, parking and other associated works. Proposed discharging of conditions 4 (Construction Management Plan) and 5 (Highway Conditions Survey) - now proposed relocation of substation, changes to rear wall of house 8 on Luckwell Road and omission of flat roof section of 8 houses on Luckwell Road.
Land Southwest Of Stoke Park Primary School Romney Avenue Bristol
Application to approve details in relation to condition 12 (roof plant) of permission 19/01927/FB Demolition of vacant caretakers house and construction of educational facility for 1,220 pupils with Sports Hall facility; Artificial Sports Pitch; Multi-Use Games Area; car, minibus and cycle parking; landscaping, access and associated highway works in Romney Avenue, Constable Road, Brangwyn Grove and Cotman Walk.
Workshop Chaplin Road Bristol BS5 0LB
Application for a non-material amendment following grant of planning permission. 17/00088/F - Demolition of existing coach house and construction of new 2-bedroom dwelling - now proposed 2no. bedrooms moved from roof space to basement and omission of dormer roof structure.