Safran Nacelles Ltd Bancroft Road Burnley Lancashire BB10 2TQ
Request for a Screening Opinion in relation to proposed solar photovoltaic (PV) development.
Land At Low Bank Burnley BB12 6PP
Application for Permission in Principle for residential development of 4no. dwellings and provision of formal link to the Greenway (Resubmission of PIP/2021/0702).
Crow Wood Holme Road Stoneyholme Burnley Lancashire BB12 0RT
Proposed development of a ground mounted solar voltaic array and associated infrastructure
Land At Low Bank Burnley BB12 6PP
Permission in Principle for residential development of 6 dwellings and provision of formal link to the Greenway.
Land To The West Red Lees Road Cliviger Burnley
Footpath diverson under S257 of the TCPA, 1990. Proposed residential development.
Former Huncoat Power Station Site Altham Lane Huncoat Accrington
Request for screening opinion for development for housing and associated infrastructure under 2017 EIA Regulations (previously assessed under 11/17/0463)
Land South Of The A646 Hollins Cross Farm Burnley
Request for a Screening Opinion for in relation to a Residential Development of 200 Dwellings
Haweswater Aqueduct Valve House Haslingden Road Rawtenstall Rossendale Lancashire
Full (EIA Development): proposed works for and use of replacement section of aqueduct, including earthworks, new supply network connection and ancillary infrastructure including: a new valve house building within fenced compound with permanent vehicular access provision; installation of tunnel shafts and open cut connection areas; within temporary construction compounds, to include site accesses, storage areas, plant and machinery and drainage infrastructure. In addition, mine grouting works, to facilitate main tunnelling works.
Land To The West Of Eaves Barn Cottage St Johns Road Padiham
Request for Screening Opinion for development of 132 kV overhead line with 3 conductors and 10 wooden poles
Land Of Accrington Road Burnley
Environmental impact assessment screening opinion for outline application for B1(b & c) B2, B8 development