The Perse Upper School Hills Road Cambridge Cambridgeshire CB2 8QF
S73 application to vary condition 10 (Hours of collections and deliveries) of planning permission 22/00693/FUL (Demolition of existing double garage and store; erection of ground and first floor extension to provide additional office accommodation) to change the hours from 0800 hours and 1800 hours on Monday to Friday, 0800 hours to 1300 hours on Saturday and at no time on Sundays, Bank or Public Holidays to 0700 hours and 1800 hours on Monday to Friday, 0700 hours to 1300 hours on Saturday and at no time on Sundays, Bank or Public Holidays.
The Perse Upper School Hills Road Cambridge Cambridgeshire CB2 8QF
Demolition of existing double garage and store; erection of ground and first floor extension to provide additional office accommodation.
21-25 Northampton Street Cambridge Cambridgeshire
Demolition of existing single storey elements (kitchen and toilet), rear boundary wall and art room. Change of use of No.25 from student accommodation to office accommodation. Construction of a new single storey link between No.21-24 Northampton Street and first floor rear extension at No.25; replacement of ground floor facade to No.21-24; alterations to Cripps Lane, car park and creation of new pedestrian route to the rear of No.21-25 including boundary treatments; installation of associated plant including PV panels and ASHP to roof of No.25; cycle parking and external insulation.
Tanner And Hall Ltd Station Road Harston Cambridge Cambridgeshire CB22 7QP
Outline planning permission for the demolition of existing buildings and provision of up to 16 dwellings up to 120sq.m of office accommodation access public open space and landscaping (including details of access and with all other matters reserved)
Former Spicers Site Sawston Bypass Sawston Cambridgeshire CB22 3JG
Demolition of 582 sq.m (GIA) storage building (B8 Use Class) and erection of 50,445 sq.m (GIA) of research and development accommodation (B1(b) Use Class), including ancillary accommodation and broken down as follows: (i) Office accommodation (9,503 sq.m); (ii) Wafer fabrication (FAB) cleanroom (22,351 sq.m); (iii) Single level basement incorporating 284 no. car parking spaces (9,417 sq.m); (iv) Central Utilities Building (8,694 sq.m); (v) External storage building (480 sq.m); (vi) Cycle parking spaces (80 for staff and 6 for visitors, total 86); (vii) Surface, disabled and visitor car parking (16 spaces) adjacent to the office building entrance; (viii) Access and circulation roads, engineering works and footpaths / cycleways; (ix) Drainage and servicing infrastructure; and (x) Hard and soft landscaping.