Waterbeach Barracks, Key Phase 1 East Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for approval of appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, junctions and turning heads (including temporary bus turning area), land reprofiling (including creation of a landscaped bund), utilities infrastructure (including alignment of service runs and location of substations), foul and surface water drainage infrastructure (including pumping station and connection to existing ditch course), street lighting, areas of common or strategic green infrastructure, open space and public realm (including ecological mitigation, planting, productive landscape, footways / cycleways and necessary bridge structures), lighting, boundary treatments, sustainable drainage features, street furniture, allotments (including parking and temporary access), any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire
Submission of details required by condition 10 (Hard Landscaping) of planning permission 20/02568/FUL: Notwithstanding the approved plans, no development above slab level shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. Submitted hard landscape details shall include plans, drawings and sections at an appropriate scale together with supporting text and shall include the following: a)Details of all hard landscape areas, including specifications for all proposed hard surfacing, kerbs, edges, ramps and channels, including dimensions, materials, finish, colour and typical construction. b)Details of all changes in levels and junctions between areas of different hard materials. c)Details and specification for all inspection and utilities covers set within hard surfaced areas. d)Details of all street furniture including benches, tree guards, landscape lighting, etc. e)Details of any fencing, including the proposed feature fence to the side boundary of Unit1. Reason: In the interests of the appearance of the completed scheme, as required by South Cambridgeshire Local Plan 2018 Policies HQ/1.
Waterbeach Barracks Key Phase 1 Lake Spur Denny End Road Waterbeach Cambridgeshire
Approval of access, appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, parcel access junctions, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of common or strategic green infrastructure, open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways and necessary bridge structures, lighting, boundary treatments, sustainable drainage features, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.