Land At Belsar Farm Meadow Road Willingham CB24 5JL
Variation of conditions 3 (materials), 4 (hard and soft landscapes), 6 (tree protection), 8 (contamination), 9 (foul water drainage), 10 (surface water drainage), 13 (construction management plan), 14 (boundary treatments), 22 (biodiversity) and 26 (construction programme) of planning permission S/3145/16/FL (Erection of 25 dwellings including 40% affordable along with access car and cycle parking and associated landscaping)
Land North Of Pathfinder Way Northstowe Cambridgeshire
Construction of a temporary Modular Community Building for a period of 3 years with associated parking, landscaping, boundary treatment and access.
38 High Street Little Shelford Cambridgeshire CB22 5ES
Single storey rear extension and two storey side extension, demolition of two existing garages and the construction of two detached garages. Demolition and construction of a new front boundary wall, alterations to the existing vehicular access and landscaping.
188 Barton Road Comberton Cambridgeshire CB23 7BU
Submission of details required by conditions 3 (CEMP and Piling), 5 (Drainage), 7 (Flood Resilient Construction), 8 (Biodiversity), 9 (lighting design strategy biodiversity), 10 (Landscaping), 11 (Boundary treatment), 13 (External finishes) and 16 (Carbon reduction measures) of planning permission 21/03751/S73
Waterbeach Barracks, Key Phase 1 East Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for approval of appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, junctions and turning heads (including temporary bus turning area), land reprofiling (including creation of a landscaped bund), utilities infrastructure (including alignment of service runs and location of substations), foul and surface water drainage infrastructure (including pumping station and connection to existing ditch course), street lighting, areas of common or strategic green infrastructure, open space and public realm (including ecological mitigation, planting, productive landscape, footways / cycleways and necessary bridge structures), lighting, boundary treatments, sustainable drainage features, street furniture, allotments (including parking and temporary access), any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
Belsar Farm Meadow Road Willingham CB24 5JL
Submission of details required by conditions 3 (Materials samples), 4 (Landscaping), 6 (Tree Protection), 8 (Contamination), 9 (Foul Water Drainage), 10 (Surface Water Drainage), 13 (Site Management), 14 (Boundary Treatment), 22 (Biodiversity) and 26 (Construction Programme) of permission S/3145/16/FL
6 Pierce Lane Fulbourn CB21 5DL
Variation of condition 2 (approved plans) and condition 6 (hard and soft landscaping) of ref: 20/02833/FUL (Demolition of existing commercial buildings and construction of five dwellinghouses (one detached and four terrace) together with open and covered parking and includes pedestrian and vehicular access) to amend the external appearance of the dwellings, garage and car port and retention of existing walls forming part of the boundary treatment.
Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire
Submission of details required by condition 10 (Hard Landscaping) of planning permission 20/02568/FUL: Notwithstanding the approved plans, no development above slab level shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. Submitted hard landscape details shall include plans, drawings and sections at an appropriate scale together with supporting text and shall include the following: a)Details of all hard landscape areas, including specifications for all proposed hard surfacing, kerbs, edges, ramps and channels, including dimensions, materials, finish, colour and typical construction. b)Details of all changes in levels and junctions between areas of different hard materials. c)Details and specification for all inspection and utilities covers set within hard surfaced areas. d)Details of all street furniture including benches, tree guards, landscape lighting, etc. e)Details of any fencing, including the proposed feature fence to the side boundary of Unit1. Reason: In the interests of the appearance of the completed scheme, as required by South Cambridgeshire Local Plan 2018 Policies HQ/1.
Waterbeach Barracks North Of The Cambridge Reseach Park Roundabout Waterbeach Cambridge Cambridgeshire
Temporary construction haul road including a temporary vehicular access from the A10, construction of a culvert structure, boundary fencing, access gate, signage, wheel wash facilities, construction of engineered drainage works, drainage swale, filter drains, temporary connection to drainage pond, headwalls, soft landscaping, tree and woodland planting, habitat creation and ecological mitigation measures, earthworks, ground remodelling, area for construction use, and any necessary vegetation, tree and hedgerow removal and demolitions.
Waterbeach Barracks Key Phase 1 Lake Spur Denny End Road Waterbeach Cambridgeshire
Approval of access, appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, parcel access junctions, land reprofiling, utilities infrastructure including alignment of service runs, foul and surface water drainage infrastructure, street lighting, areas of common or strategic green infrastructure, open space and public realm including ecological mitigation, soft and hard landscaping, planting, productive landscape, footways / cycleways and necessary bridge structures, lighting, boundary treatments, sustainable drainage features, street furniture, any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.