Redevelopment Area Of Mill Lane Cambridge Cambridgeshire
Submission of details required to enable a partial discharge (in respect of Phases 1A and 1B only) of conditions 3 (contamiation),4 (remediation strategy), 7 (Materials Management Plan), 9 (Phasing Plan), 10 (Noise and Dust), 13 (Dust Management Plan), 14 (Airborne Dust), 15 (Demolition Strategy), 16 (Noise Impact Assessment), 21 (Electric Vehicle Charge Point), 22 (Ventilation Systems). Submission of details to enable a full discharge of conditions 30 (Hard and Soft Landscape Works), 32 (Bird Box), 34 (Bat Survey), 45 (Public Art Strategy), 46 (Archaeology), 48 (Pedestrian Crossing) and 49 (Traffic Management Plan) of planning permission 18/1930/FUL.
2 West Green Barrington CB22 7SA
S73 variation of conditions 2 (Approved plans) and 6 (Flat roof covering) of ref: S/0102/20/FL (Demolition of existing outbuilding erection of a single storey side extension alterations to the existing dwellinghouse and associated infrastructure) to amend the roof form in order to create a more subtle and sympathetic roof form and condition 6 to be varied to allow the full discharge of the condition.
Former Cement Works Barrington Cement Works Haslingfield Road Barrington CB22 7RQ
Discharge of Conditions 19(Surface Water Drainage Scheme) 20(Disposal of Surface Water Scheme) & 22(Surface Water Disposal Scheme) and 27 (Foul Water Drainage) of (Planning Application S.0057.17.VC) - Demolition of all existing buildings and structures and redevelopment to provide up to 220 residential units formal and informal open space including allotments car parking for Barrington Primary School new pedestrian and cycle links to Barrington village and Foxton Station.
Waterbeach Barracks Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Discharge of condition 10.j & k (Key Phase Surface Water and Foul Water Drainage Strategy) From application S/0559/17/OL - Up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road.