Gravel Hill Farm Madingley Road Cambridge Cambridgeshire CB3 0FU
Continued temporary use of land for a further period of 10 years to retain a project office, the continued use of the existing farmhouse and previously approved extension as meeting rooms and staff rooms, use of building 254 as part office, part storage and use of barns 245 and 253 for associated storage. The retention of site access and service road, car and cycle parking, landscaping, fencing, gates and low level lighting and associated infrastructure connections.
Abbey Barns Duxford Road Ickleton Cambridgeshire CB10 1SX
Two storey extension to Unit 4 and the erection of 2no. new building for office / research and development uses (Use Class E) together with associated car parking, infrastructure and landscaping.
9 High Street Histon Cambridgeshire CB24 9JD
Demolition of single storey workshops. Construction of a two storey rear extension. Refurbishment, re-roofing, and re-cladding of an existing two storey office block. Creation of a Net Zero office development with a single storey front retail unit. New hard and soft landscaping throughout.
Melbourn Science Park Cambridge Road Melbourn Cambridgeshire
EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for Proposed demolition of 13,629sq.m of existing buildings, alterations and extensions by 1,275 sq.m to retained buildings to allow use within Class E within Ash House, Class E(b) within Moat House for use as gastro pub and Class C1 (hotel) within the new wing rear of Moat House, development of 41,406 sq.m of new office and technology research facilities (Class E(g)(i), (ii) and (iii)) and 23,099 sq.m of ancillary buildings including transport hub for vehicle and cycle parking, together with plant and infrastructure works including formation of two additional vehicular accesses and one additional vehicular egress from Cambridge Road and landscaping at Melbourn Science Park (the Project). The net additional floorspace will amount to 54,484 sq.m
Elm Lodge Meadow Drift Elsworth Cambridgeshire CB23 4HS
S73 variation of condition 2 (Approved plans) of planning permission 21/02515/FUL (Demolition of existing bungalow and construction of a 5 bedroom replacement dwelling together with garage, driveway and landscaping) to remove the basement floor of the house and remove the sunken courtyard, to provide new plans for the ground and second floor, and extend the permitted garage to provide an additional car parking space and larger home office.
The Library Ascham Road Cambridge Cambridgeshire CB4 2BD
Application to discharge conditions 3 (materials), 4 (building joinery), 5 (hard landscaping joinery), 15 (artificial lighting), 17 (travel plan) of planning permission CCC/20/020/FMW alterations to entrance including new doors window and canopy, erection of a single storey rear extension, path, additional car parking spaces and internal remodelling works to allow the change of use from a library storage depot and office to a Register Office for registering births, deaths and still-births, dealing with legal preliminaries for ceremonies; conduting ceremonies and associated functions.
Land To The Rear Of Church Meadows Haslingfield Road Barrington Cambridgeshire
Development of a countryside centre in conjunction with offices, extension of access road and construction of car park and associated landscaping
FORMER Mill Road Depot Mill Road Cambridge Cambridgeshire CB1 2AZ
S74B to vary condition 3 of planning permission 19/0175/FUL (The erection of an apartment building (45 affordable dwellings); erection of mixed use building with community centre and ancillary office and meeting rooms on ground floor with 4 affordable dwellings above; change of use of Gate House to mixed use (commercial ground floor (A1/A2/A3/B1/D1 in the alternative) and 1 dwelling on first floor), together with associated external works including provision of open space (including play area), cycle parking, landscaping and demolition of 'link building' attached to Old Library (Grade II listed) to change the construction working hours to - extension of working hours on Saturdays until 1800 and allow work inside buildings to continue until 2100 Monday to Friday.