Proposed Development South Of Church Lane Papworth Everard Cambridgeshire
Non material amendment of planning permission S/1159/19/VC (Variation of conditions 5 (Arboricultural method statement) 11 (Remediation method statement) 14 (Demolition and construction method statement) and 30 (Remediation method statement) of planning permissionS/2859/16/VC) Change to materials on building.
Proposed Development South Of Church Lane Papworth Everard Cambridgeshire
Non material amendment of planning permission S/1159/19/VC (Variation of conditions 5 (Arboricultural method statement) 11 (Remediation method statement) 14 (Demolition and construction method statement) and 30 (Remediation method statement) of planning permission S/2859/16/VC) to adjust the fence line position for blue land plots B01 to B09 and Provide a detailed Arboricultural Method Statement for the site.
Proposed Development South Of Church Lane Papworth Everard Cambridgeshire
Non material amendment of planning permission S/1159/19/VC (Variation of conditions 5 (Arboricultural method statement) 11 (Remediation method statement) 14 (Demolition and construction method statement) and 30 (Remediation method statement) of planning permissionS/2859/16/VC) Amendment to the location of the local area of play, and slight change in the local area of play equipment to suit the new location.
Barrington Cement Works Haslingfield Road Barrington Cambridge Cambridgeshire CB22 7RQ
Non material amendment of planning permission 21/01474/S73 (Variation of condition 2 (reserved matters details) pursuant to planning application 20/02528/S73 (Variation of conditions 2 (Reserved matters), 5 (Construction Environment Management Plan and a Construction Method Statement), 6 (Airborne Dust), 7 (Site waste management plan), 8 (Tree protection measures), 9 (Boundary Treatment), 10 (Siting and design of the screened storage for refuse), 14 (Renewable energy statement), 15 (Contamination), 16 (Noise insulation scheme or noise mitigation Strategy), 19 (Surface water drainage scheme), 20 (Surface water), 21 (Remediation Statement - Contamination), 22 (Scheme for disposal for surface water), 24 (Visibilty splays), 26 (Recording of Industrial Heritage), 27 (Foul water solution), 28 (Archaelogical works) and 29 (Fire hydrants) pursuant to planning permission S/0057/17/VC)) Change the block paving material