8 Church Street Guilden Morden Cambridgeshire SG8 0JD
Demolition of existing canopy, coal shed and wc to rear and construction of new single storey extension to rear, internal alterations to create new ensuite and dressing room to bedroom
18 High Street Barrington Cambridgeshire CB22 7QX
Demolition of existing single storey side extension and replacement with new single storey side/rear extension
26 Abington Pottery High Street Little Abington Cambridgeshire CB21 6BG
Single storey rear extension following the demolition of the existing workshop and lean-to. Addition of an air source heat pump and section of boundary fence in the rear garden. Minor internal and external alterations and refurbishments.
7 West Wratting Road Balsham Cambridgeshire CB21 4DX
Construction of a single storey garden room extension, demolition of existing garage/outbuilding and replace with an outbuilding and removal of the shutters.
331 High Street Cottenham Cambridgeshire CB24 8TX
Proposed barn conversion/replacement including: re-roofing and demolition of external toilet block.
101 Station Road Gamlingay Cambridgeshire SG19 3HB
Part single storey, part two storey rear extension following the demolition of the existing rear extension.
29 Maids Causeway Cambridge Cambridgeshire CB5 8DE
Demolition of existing rear extension and the erection of a single storey extension and associated minor alterations
1 Brunswick Walk Cambridge Cambridgeshire CB5 8DH
Demolition of existing rear extensions and outbuildings (sheds). Single storey rear extension including altered access from Brunswick Gardens and two storey rear extension including the remodelling of existing roof pitch and new pedestrian access from Brunswick Walk.
Meadow Cottage High Street Castle Camps Cambridgeshire CB21 4SP
Single storey side and rear extensions following the demolition of the existing side conservatory and rear porch. Internal and external alterations.
Building 6 Imperial War Museum Royston Road Duxford Cambridgeshire
Works to include ramp, steps, hard surfacing, CCTV cameras, addition of canopy, removal of existing canopy and delivery platform, replacement gate, demolition of external wall, louvres, replacement rainwater goods, refurbishment or replacement of windows (to include secondary glazing) and doors, new doors, enlargement of two windows to create double door, installation UV film, installation of air source heat pumps, insulation of loft and walls, removal of internal walls, blocking up of doorways, reinstatement of original openings, and revised internal layout to include increased office space