67 Pettitts Lane Dry Drayton Cambridgeshire CB23 8BT
Single storey rear extension, internal alterations and all associated works.
Peterhouse, Old Court Trumpington Street Cambridge Cambridgeshire CB2 1RD
Single storey side extension, updates to existing built fabric of the existing extension, and new bicycle/bin storage.
Galewood Hinton Way Great Shelford Cambridgeshire CB22 5AN
Removal of existing conservatories and construction of new single storey extension and conservatory to rear.
75 - 77 Chishill Road Heydon Cambridgeshire SG8 8PN
Merging of existing dwellinghouses and the subsequent erection of a single-storey rear extension, remedial works, and other associated works and infrastructure.
8 Church Street Guilden Morden Cambridgeshire SG8 0JD
Demolition of existing canopy, coal shed and wc to rear and construction of new single storey extension to rear, internal alterations to create new ensuite and dressing room to bedroom
28 Mill Lane Linton Cambridgeshire CB21 4JY
Single storey rear and side extension, internal and external refurbishment and removal of the existing garage
18 High Street Barrington Cambridgeshire CB22 7QX
Demolition of existing single storey side extension and replacement with new single storey side/rear extension
Appletrees Cardinals Green Horseheath Cambridgeshire CB21 4QY
Removal of a single storey C.20th extension and construction of a new one and a half storey extension. Removal of an existing detached garage structure and erection of a new detached garage and store.
26 Abington Pottery High Street Little Abington Cambridgeshire CB21 6BG
Single storey rear extension following the demolition of the existing workshop and lean-to. Addition of an air source heat pump and section of boundary fence in the rear garden. Minor internal and external alterations and refurbishments.
21 The Common West Wratting Cambridgeshire CB21 5LR
Rear pitched roof extension over rear flat roof, new bathroom installation in existing attic, create new glazed door opening to rear, ground sited solar panel installation, air source heat pump installation, relocate entrance gates to create car pull-off from road.