68 Town Street Newton Cambridgeshire CB22 7PE
Roofing and internal insulation of an existing walled courtyard, and the addition of glazing to provide additional internal accommodation. Removal of a window in the main house to provide access to new accommodation. The removal of a brick-built shed and the addition of an annex to the west of the walled courtyard provide living and bedroom accommodation. Removal of a small window in the north-west elevation of the main house and its replacement with a roof light.
8 Church Way Haslingfield Cambridgeshire CB23 1JR
Two storey side extension, new roof light windows and replacement garden shed.
Lock House Jesus Green Victoria Avenue Cambridge Cambridgeshire CB4 3BD
First floor balcony to side with creation of new door opening, conversion of storage shed to utility room with timber cladding to both rear lean-to extensions and cycle store to side. Installation of 2no. windows and 1no. roof light/sun tube, an air source heat pump, external shutters, internal insulation, external lighting and security cameras, internal stud wall, replacement stairs, and repair and refurbishment of existing doors and windows.
The Grange 13 Church Street Great Shelford CB22 5EL
New and replacement garden walls forming kitchen garden and service yard, new replacement sheds and pergola and new window in gym
6 Orchard Street Cambridge Cambridgeshire CB1 1JS
Replacement of rear elevation window and doors, re-roofing of single storey rear extension and shed, addition of shutters and railings to front elevation.
17 Cambridge Road Madingley CB23 8AH
Demolition of existing rear extensions and replacement with single storey link element and one and a half storey extension with associated hard and soft landscaping, alterations to main house including removal of roof lights to front elevation and changes to windows, replacement of garden gates and garden shed
Clare Barn Main Street Caldecote CB23 7NU
This application is further to listed building consents S/1045/13/LB and S/2616/14/LB and seeks to renew the permission for the works to be carried out including: 1. Extend the single storey lean-to lobby on the north elevation to create a utility; 2. Alterations to the Listed Barn including: - Infill and insulate the covered entrance lean-to; - Replace the double height window on the rear (west) elevation; - New staircase and replacement landing balustrade including false plasterboard ceiling services void beneath the landing; - New internal doors; - New glazed screen within the existing modern partition 3. Alterations to open up the living accommodation in the modern link including: - Infill window on north elevation and form new rooflights. - Replacement windows and doors with full height units on the south elevation to reinforce the cart shed appearance; - Raising the floor by between 150-200mm depending on varying levels of existing floor to make level and facilitate drainage and access throughout the house; - New wood burning stove and flue in the centre of the north side of the sun room 4. Alterations to the modern annexe to include: - New external and internal doors; - New replacement windows; - New staircase; - New insulated solid floor (raised by 150-200mm level with the link floor to facilitate access); - Internal insulation to the north side; - New rooflights
Madingley Hall Church Lane Madingley CB23 8AQ
Repair and maintenance works to the roof including: a) Localised repairs to sarking boards and battens, replacing tiles only where necessary with hand-made tiles where salvaged tiles incapable of reuse b) improvements to thermal resistivity within attic space c) renewal of lead work to flat roofing, gutters etc around pitched roofs d) redecoration and localised repair to roof windows e) new lead flashing between roof, brick chimney stacks, gables, parapets etc f) reinstallation of lightning protection g) minor repairs to timber structure within roof void h) Replacement of existing timber ladder leading from front roof to rear roof i) Indent stone repairs to parapet walls to front elevation. j) Improvements to increase capacity of existing rainwater outlets and hoppers, subject to calculation of current capacity of roof to shed water during heavy storms. k) Repointing of the masonry chimney stacks and parapet walls to front elevation.