West Anglia Main Line At Shepreth Branch Junction Cambridgeshire
Submission of details required for discharge of condition 12 (Construction Ecological Method Statement) of the deemed planning consent associated with the Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (Local Planning Authority Reference 21/03035/TWA)
West Anglia Main Line Land Adjacent To Cambridge Biomedical Campus Cambridge
Submission of details required for discharge of condition 12 (Construction Ecological Method Statement) of the deemed planning consent associated with the Network Rail (Cambridge South Infrastructure Enhancements) Order 2022 (Local Planning Authority Reference 21/02957/TWA)
45-47 Woodlark Road Cambridge Cambridgeshire CB3 0HT
Discharge of conditions 3 (details of boundary fence/enclosure), 4 (secure parking of cycles) and 5 (on site storage facilities for waste) of planning permission Condition 3: Boundary fence now in place, close boarded and shown with measurement photo of height measuring between 1.8 - 2m in height. Condition 4: Secure, covered bicycle parking shown to both no's 45 & 47. At no. 45 is shown an existing store of timber construction. At no. 47 is shown an existing store of brick construction. Condition 5: Wheelie bins at both no's 45 & 47 shown to be stationed to the side of each property within 10m of the kerbside and to be brought to kerbside on collection days.
88 North End Bassingbourn Cum Kneesworth Cambridgeshire SG8 5PD
Discharge of condition 3 (Surface and Foul Water), 4 (Parking Plan), 5 (Construction Environmental Management Plan), 6 (Ecological Enhancement), 7 (Secure Cycle Parking), 8 (10% Carbon Emission), (10 (Boundary Treatment) and 11 (Water Efficiency) and 12 (Pedestrian visibility splays) of planning permission
Land South Of Secondary School Playing Fields And North Of Addenbrookes Busway Spur Within Clay Farm Green Corridor Clay Farm, Cambridge
Partial Discharge of Condition 59 (Detailed Construction Method Statement) of Active Recreation Area, permitted under reserved matters planning consent 15/1829/REM
15 Kingfisher Close Bourn Cambridgeshire CB23 2TJ
Discharge of condition 3 (Scheme for flood resilient /resistant construction) of planning permission 21/04316/HFUL
Land At Chesterton Sidings Cowley Road Land At Chesterton Sidings Cowley Road Cambridge
Discharge of Conditions 17 (Details of green and brown roofs), 18 (Landscape and Ecological Management plan (LEMP), 19 (Mitigation plan for the provision of a scrub mitigation strip), 29 (Surface and foul water drainage), 31 (Risk To Groundwater) and 33 (Construction Environmental Management plan (CEMP)) pursuant to planning permission S/2372/17/FL
Waterbeach Barracks And Airfield Site Waterbeach Cambridgeshire
Discharge of condition 8(site wide construction environmental management strategy) 9(explosive ordnance mitigation and safety management plan)10(h) (archaeological written scheme of investigation) and 10(i) (land investigation and remediation scheme) pursuant to outline planning permission S/0559/17/OL
Monkfield Nutrition High Street Shingay Cum Wendy SG8 0HJ
Discharge of Conditon 14 - A written strategy for the minimisation of noise, vibration and dust generation during the course of the construction of the development, ii) Contractors access arrangements for vehicles, plant and personnel, iii) Contractors site storage area(s) and compounds(s), iv) Parking for contractors vehicles and contactors personnel vehicles.
Waterbeach Barracks Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Discharge of condition 10.j & k (Key Phase Surface Water and Foul Water Drainage Strategy) From application S/0559/17/OL - Up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road.