95 Bannold Road Waterbeach Cambridgeshire CB25 9LQ
Application for the approval of all reserved matters (appearance, landscaping, layout and scale) for 5 no. dwellings pursuant to outline planning permission ref: 20/03370/OUT (Outline planning permission with some matters reserved except for access for the demolition of the existing house and the erection of five dwellings).
Wellcome Trust Genome Campus Cambridge Road Hinxton Saffron Walden Cambridgeshire CB10 1SD
Reserved Matters Approval for the access, appearance, landscape, layout and scale in respect of improvement works along the A1301 including new and upgraded junctions, carriageway realignment; new footways/cycleway, pedestrian crossing points; lighting, surface water drainage infrastructure; utilities and infrastructure works; improvements to existing agricultural accesses; associated engineering and land remodelling and tree removal , including the demolition of existing closeboarded timber fence and replacement with metal estate railing and brick and flint wall. (Outline reference: S/4329/18/OL)
Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridgeshire CB25 9PA
Reserved matters application for approval of access, appearance, landscape, layout and scale in respect of the provision of an electricity substation located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL (Outline Planning Application for up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road). An Environmental Statement was submitted to South Cambridgeshire District Council (the Local Planning Authority) with the Waterbeach Barracks outline planning application.
Wellcome Trust Genome Campus Cambridge Road Hinxton Saffron Walden Cambridgeshire CB10 1RQ
Reserved Matters Approval of appearance, landscape, layout and scale for strategic green infrastructure, and the construction of a decked car park to support the Translational Office Space Project Building (TOSP), at the Genome Wellcome Campus (Outline reference: S/4329/18/OL) comprising: hard and soft landscape works, ecological mitigation and enhancement works; creation of pedestrian routes; tree removal and replacement and additional planting; provision of street furniture; construction of a decked car park including improvements to an existing access and pedestrian routes; drainage and utilities infrastructure; lighting, and all associated temporary construction operations, engineering works, demolition and groundworks and remodelling.
51 - 55 Elizabeth Way Cambridge Cambridgeshire CB4 1DB
Reserved matters application for Appearance and Landscaping following outline planning permission 19/0819/OUT (Demolition of 51-55 Elizabeth Way and construction of a new two & a half storey block of flats comprising nine apartments, associated amenity space and cycle parking provision (outline application -layout, scale and access not reserved))
Waterbeach Barracks, Key Phase 1 East Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved matters application for approval of appearance, landscape, layout and scale in respect of strategic green, grey and blue infrastructure, ground remodelling and associated works at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), comprising: internal primary, secondary and tertiary streets, junctions and turning heads (including temporary bus turning area), land reprofiling (including creation of a landscaped bund), utilities infrastructure (including alignment of service runs and location of substations), foul and surface water drainage infrastructure (including pumping station and connection to existing ditch course), street lighting, areas of common or strategic green infrastructure, open space and public realm (including ecological mitigation, planting, productive landscape, footways / cycleways and necessary bridge structures), lighting, boundary treatments, sustainable drainage features, street furniture, allotments (including parking and temporary access), any necessary temporary stockpiling of construction materials, areas for construction use, temporary haul routes and any necessary demolition.
26 Wimpole Road Great Eversden Cambridgeshire CB23 1HR
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/2399/19/OL (Outline planning permission with some matters reserved except for access for the demolition of a single dwelling & outbuildings and construction of two dwellings (S/3499/18/OL Previous App)) for plot 2 only
39A And Lion Works Station Road (west) Whittlesford Cambridge Cambridgeshire CB22 4NL
Approval of matters reserved for access, appearance, landscaping, layout and scale following outline planning permission S/0746/15/OL to provide 67 residential units following demolition of 39a Station Road West and the formation of a new access road. (Re-submission of 20/03755/REM)
Ida Darwin Hospital Fulbourn Old Drift Fulbourn Cambridge Cambridgeshire CB21 5EE
Application for all matters reserved for Layout, Scale, Appearance and Landscaping following the granting of outline approval ref: S/0670/17/OL Dated 19th November 2019 for up to 203 dwellings including affordable housing and land for community provision with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Waterbeach Barracks Denny End Road Waterbeach Cambridge Cambridgeshire CB25 9PA
Reserved Matters approval of access, appearance, landscape, layout and scale in respect of works to construct a perimeter pedestrian route, ground remodelling, and associated works at the existing Waterbeach Barracks Lake located at Key Phase 1 of the Waterbeach Barracks and Airfield development (Ref: S/0559/17/OL), including: hard and soft landscaping; land reprofiling; lighting; planting; any necessary demolition; areas for construction use and temporary stockpiling; and works to create construction access.