Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridgeshire CB25 9PA
Reserved matters application for approval of access, appearance, landscape, layout and scale in respect of the provision of an electricity substation located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL (Outline Planning Application for up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road). An Environmental Statement was submitted to South Cambridgeshire District Council (the Local Planning Authority) with the Waterbeach Barracks outline planning application.
130 Farm Shop Station Road Willingham Cambridgeshire CB24 5HG
Relocation of farm shop, cold storage, delivery and packing facility to new facility on the farm, construction of new building and access to provide a farm shop, cold storage, packing area, delivery area, cafeteria, admin area, outside seating and increased parking, existing area will revert to general farm usage.
Land To The South Of 29 Brook Street Elsworth CB23 4HX
Construction of 2 No. detached dwellings, including demolition and re-construction of existing former shop and replacement of demolished barn to form a garage.
Northstowe Phase 1, Parcel H9 Station Road Longstanton Cambridgeshire
Non material amendment of outline planning permission S/0388/12/OL (Outline planning application for phase 1 of Northstowe comprising up to 1500 dwellings a primary school a mixed-use local centre (including a community building and provision for non-residential institutions financial and professional services shops cafes and restaurants drinking establishments and hot food take-aways) leisure community residential institutions cultural health and employment provision (business general industry and storage & distribution) including a household recycling centre formal and informal recreational space and landscaped areas and infrastructure works including site re-profiling and associated drainage works foul and surface water pumping stations two flood attenuation ponds on land east of Hattons Road and associated works including the demolition of existing buildings and structures), for a change to the Construction Environmental Management Plan (CEMP) to include provision for piling.