Land North Of Pathfinder Way Northstowe Cambridgeshire
Construction of a temporary Modular Community Building for a period of 3 years with associated parking, landscaping, boundary treatment and access.
Childerley Gate Service Station St Neots Road Caldecote Cambridgeshire CB23 8AY
Submission of details required by conditions 4 (Hard and Soft Landscaping), 5 (Replacement Planting), 7 (Construction Ecological Management Plan), 8 (Ground Gas) and 9 (Traffic Management Plan) of planning permission 20/03099/FUL
Land Adjacent To School Hill Histon CB24 9JE
Submission of details required by conditions 3 (Movements and control of muck away lorries, contractor parking, Movements and control of all deliveries and control of dust, mud and debris), 4 (Construction Environmental Management Plan (CEMP: Biodiversity)), 5 (Arboricultural Method Statement and Tree Protection Strategy), 6 (Materials), 6(d) (Ground surface finishes and ground levels), 7 (Hard and soft landscape works), 8 (Scheme to provide floodplain compensatory storage), 9 (Lighting scheme), 10 (Carbon Emissions), 11 (Scheme of biodiversity enhancement and management), 12 (Surface water drainage), 13 (Foul water drainage) and 14 (Car parking management strategy) of planning permission S/1793/19/FL
Former Garage Site Meadowcroft Way Orwell SG8 5QU
Submission of details required by conditions 4 (Scheme of ecological enhancement), 5 (Lighting design strategy for biodiversity), 6 (Energy Statement), 7 (Surface water and foul water), 8 (Scheme for flood resilient /resistant construction), 10 (Hard and soft landscaping scheme) and 11(Water Efficiency) of planning permission 21/03068/FUL
1 Town Close Fulbourn Cambridgeshire CB21 5DN
Construction of 1 No. new dwellinghouse together with associated parking and landscaping on land to the rear of 1 Town Close, Fulbourn.
1A The Cedars Bassingbourn Cambridgeshire SG8 5RE
Submission of details required by conditions 4 (Construction Environmental Management Plan) and 9 (Landscaping) of planning permission 22/00943/FUL
Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridgeshire CB25 9PA
Reserved matters application for approval of access, appearance, landscape, layout and scale in respect of the provision of an electricity substation located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL (Outline Planning Application for up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road). An Environmental Statement was submitted to South Cambridgeshire District Council (the Local Planning Authority) with the Waterbeach Barracks outline planning application.
3, 5, 7 And 9 Milton Road Impington Cambridgeshire CB24 9NF
Demolition of 4 No. existing buildings and the construction of 5 No. new dwellings and associated landscaping. (Resubmission of 22/02281/FUL)
Land South Of Babraham Road Sawston Cambridge South Cambridgeshire
Submission of details required by conditions 3 (CEMP), 4 (CEcMP), 5 (lighting design for biodiversity), 6 (Farmland Bird Mitigation Strategy), 7 (Arboricultural Method Statement), 8 (Surface Water Drainage), 9 (Surface Water Drainage (Construction)), 10 (TMP), 11(Highway Condition Survey), 13 (Garages), 14 ( Landscape and Ecological Management Plan (LEMP)), 15 (Foul Water Drainage), 16 (Materials), 17(Landscape Details), 18 (Sustainable Show Homes), 19 (Future Street Management), and 20 (Fire Hydrants ) of planning permission 21/03955/FUL
95 Bannold Road Waterbeach Cambridgeshire CB25 9LQ
Submission of details required by condition 7 (Construction Ecological Management Plan), 8 (Landscape and Ecology Management Plan) and 17 (Arboricultural Method Statement) of outline planning 20/03370/OUT