Land South Of Coldhams Lane Cambridge Cambridgeshire
Hybrid planning application comprising: For Parcel A: outline application for development of 31,400sqm (GEA) of commercial floorspace, including B8 (storage and distribution),flexible B8/E(g) (office, research, and development and light industrial) and E(g) floorspace; For Parcel B: full application for ecological enhancements through habitat creation and management with restricted public access; For Parcel C (the Lakes): full application for the opening of the Site to public access for passive recreation, alongside delivering ecological enhancements, including landscaping and public open space. (Note for consultation: This application is a resubmission of previously withdrawn application 21/02326/FUL. The proposals differ from the previously withdrawn application in some areas including some of the following: changes to red line boundary, including access along Normans Way up to Coldhams Lane; a change to the mix of uses proposed, to provide a reduction in B8 (storage and distribution) floorspace and an increase in E(g) (business) floorspace; A Land Use Parameter Plan to control the location of permitted uses, including increased separation distances between some adjacent residential properties; introduction of two possible locations for a food / drink kiosk; additional information with regard to management of the lakes (parcel C) and omission of floating islands within the eastern lake).
Land Between Stirling Way And Broadway Land For Bus Link Between Stirling Way And The Broadway Cambourne
Approval of matters reserved for access appearance landscaping layout and scale following Outline planning permission S/3329/16/OL for a bus link between Sterling Way and Broadway. The outline application was not EIA development.
Melbourn Science Park Cambridge Road Melbourn Cambridgeshire
EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for Proposed demolition of 13,629sq.m of existing buildings, alterations and extensions by 1,275 sq.m to retained buildings to allow use within Class E within Ash House, Class E(b) within Moat House for use as gastro pub and Class C1 (hotel) within the new wing rear of Moat House, development of 41,406 sq.m of new office and technology research facilities (Class E(g)(i), (ii) and (iii)) and 23,099 sq.m of ancillary buildings including transport hub for vehicle and cycle parking, together with plant and infrastructure works including formation of two additional vehicular accesses and one additional vehicular egress from Cambridge Road and landscaping at Melbourn Science Park (the Project). The net additional floorspace will amount to 54,484 sq.m
Former Hallmark Hotel Huntingdon Road Bar Hill Cambridge Cambridgeshire CB23 8EU
S73 to vary conditions 5 (hard and soft landscaping works), 12 (boundary treatments) and 25 (pedestrian crossing) of planning permission S/0851/16/FL for development of 40 residential dwellings across two sites comprising: 6 two storey houses and 27 apartments in 3 and 4 storey blocks 47 car parking spaces and associated landscaping including the retention of part of the bund and provision of a play area on part of the hotel car park and other surplus space (Site 1) and 7 two storey houses served by 14 car parking spaces and associated landscaping on part of hotel staff car park and underutilised part of golf course (Site 2), new pedestrian access off Crafts Way and a children's play area along with associated landscaping on land between Sites 1 and 2, allowed on appeal (ref: APP/W0530/W/16/3162178).
Beech Farm Church Street Harston Cambridgeshire CB22 7NR
Demolition of agricultural buildings and the erection of nine dwellinghouses and associated landscaping and development
Bourn Quarter Bourn Airfield St Neots Road Bourn Cambridgeshire
Erection of 15,056sqm/162,090sqft of commercial floorspace falling within use classes E(g)(ii) Research and Development, E(g)(iii) Industrial processes and B8 Warehouse and Distribution, landscaping, access and associated infrastructure works at Phase 2 of Bourn Quarter. This application is the subject of an Environmental Impact Assessment.
Wellcome Trust Genome Campus Cambridge Road Hinxton Cambridgeshire CB10 1SD
EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for proposed development of two bridges, associated infrastructure and other landscaping works.
Vitrum Building St Johns Innovation Park Cowley Road Cambridge Cambridgeshire CB4 0WS
EIA screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the proposed development to provide up to 12,442 sqm of employment floorspace in a building up to 34 metres in height with associated car parking, cycle parking and landscaping.
63 Middle Watch Swavesey Cambridgeshire CB24 4RW
Demolition of existing dwelling and garage and erection of retirement living development comprised of six flats with associated parking and landscaping
Land Adj 7 Station Road Over Cambridge Cambridgeshire CB24 5NJ
Erection of 8no of dwellinghouses and garages with associated development including a raised table, landscaping and open space.