Westbrook Centre Milton Road Cambridge Cambridgeshire CB4 1YG
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for Partial demolition of existing buildings and erection of new floorspace (Class E) above retained basement level and alterations to the site layout including revised access arrangements, hard and soft landscaping and associated infrastructure works.
Land At The Way Fowlmere Cambridgeshire
EIA Screening Opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for Part demolition, alterations and improvements to existing buildings, erection of new floorspace for life science use, café, gym and co-working floorspace, installation of plant and enclosures, waste and recycling storage, highway improvements to the Way, provision of cycle and car parking spaces, public realm and landscape improvements, and other associated works.
Bells School Red Cross Lane Cambridge CB2 0QU
Erection of a two and half storey, 98 bed student accommodation building with ancillary facilities and warden's flat, following the demolition of no. 7 Red Cross Lane and associated outbuildings. Alterations to existing car park layout with an increase of 11 car parking spaces associated with the new development providing a total of 72 spaces. Removal of two vehicular accesses into the site. Relocation of existing cycle parking along with the provision of a new 46 bay cycle store and a replacement electricity substation. Provision of a landscaping scheme including the erection of a 2.5m wavy wall to the rear of the car park.
Lockton House 12 Clarendon Road Cambridge Cambridgeshire CB2 8FH
S73 to vary condition 2 of ref: 20/04826/FUL (Demolition of Lockton House and 1&2 Brooklands Avenue and replacement with two new buildings comprising offices (Use Class E), flexible commercial space (Use Class E) to include a cafe, underground parking and utilities, erection of covered walkways, electricity substation, bin stores, access, cycle parking and associated hard and soft landscaping) for the retention of the gable wall of 1-2 Brooklands Avenue and associated alterations to form and appearance of Building A, installation of PV panels on Building A and B, air handling plant decks on Building A and ventilation screen to ramped vehicle entrance to Building B to meet net zero carbon aspirations, fenestration changes, and other minor material amendments.
Peterhouse College Boathouse Pretoria Road Cambridge Cambridgeshire CB4 1HD
Erection of a two storey side and rear extension to existing boathouse following demolition of existing single storey extension, external alterations comprising provision of a disabled car parking space, cycle parking and landscaping works.
Redevelopment Area Of Mill Lane Cambridge Cambridgeshire
Application under S73 for variation of condition 2 (Approved Drawings) of planning permission 18/1930/FUL (Redevelopment of site to form expansion of Pembroke College comprising repurposing of existing buildings, demolition and erection of new buildings for a mix of uses comprising 94no. student residential units, 1478sqm B1 College office floorspace, 1773sqm D1 teaching space, 1004sqm D2 College leisure and community floorspace, 363sqm commercial A1, A2, A3, A4 retail, food and drink floorspace; and ancillary uses comprising landscaping and hard surfacing, formation of new courtesy crossing at Trumpington Street, highways, vehicular and cycle parking, and associated works and infrastructure.) for design alterations
Land To The Rear Of 30 Chiswick End Meldreth Royston Cambridgeshire SG8 6LZ
Approval of matters reserved for appearance, landscaping, layout and scale following outline planning permission S/4058/17/OL for the erection of two dwellings with demolition of lean-to of existing building and alterations to existing highway access
6-18 King Street Cambridge Cambridgeshire CB1 1LN
Variation of Condition 2 (Approved Drawings) of planning permission 17/1497/FUL (Erection of 64 student rooms, 7 student kitchens, 4 college offices, music practice room and seminar rooms, commercial unit (386 sqm) provision of a connection to the Todd Building and associated landscaping and cycle parking (includes demolition of later structure of 6-10 with facade retention, demolition of 12 to 16 and alterations to 18)) to enable alterations to the design and allow for internal adjustments for fire precautions, plant and renewable energy features