Redevelopment Area Of Mill Lane Cambridge Cambridgeshire
Non material amendment of planning permission 18/1930/FUL (Redevelopment of site to form expansion of Pembroke College comprising repurposing of existing buildings, demolition and erection of new buildings for a mix of uses comprising student residential units, B1 College office floorspace, D1 teaching space, D2 College leisure and community floorspace, commercial A1, A2, A3, A4 retail, food and drink floorspace, and ancillary uses comprising landscaping and hard surfacing, formation of new courtesy crossing at Trumpington Street, highways, vehicular and cycle parking, and associated works and infrastructure) to amend the trigger point for condition 38 to prior to installation of water services.
Northstowe Phase 1, Parcel H8 Station Road Longstanton Cambridgeshire
Non material amendment of outline planning permission S/0388/12/OL (Outline planning application for phase 1 of Northstowe comprising up to 1500 dwellings a primary school a mixed-use local centre (including a community building and provision for non-residential institutions financial and professional services shops cafes and restaurants drinking establishments and hot food take-aways) leisure community residential institutions cultural health and employment provision (business general industry and storage & distribution) including a household recycling centre formal and informal recreational space and landscaped areas and infrastructure works including site re-profiling and associated drainage works foul and surface water pumping stations two flood attenuation ponds on land east of Hattons Road and associated works including the demolition of existing buildings and structures) Change of CEMP to include provision for piling.
Northstowe Phase 1, Parcel H9 Station Road Longstanton Cambridgeshire
Non material amendment of outline planning permission S/0388/12/OL (Outline planning application for phase 1 of Northstowe comprising up to 1500 dwellings a primary school a mixed-use local centre (including a community building and provision for non-residential institutions financial and professional services shops cafes and restaurants drinking establishments and hot food take-aways) leisure community residential institutions cultural health and employment provision (business general industry and storage & distribution) including a household recycling centre formal and informal recreational space and landscaped areas and infrastructure works including site re-profiling and associated drainage works foul and surface water pumping stations two flood attenuation ponds on land east of Hattons Road and associated works including the demolition of existing buildings and structures), for a change to the Construction Environmental Management Plan (CEMP) to include provision for piling.