Land At Belsar Farm Meadow Road Willingham CB24 5JL
Variation of conditions 3 (materials), 4 (hard and soft landscapes), 6 (tree protection), 8 (contamination), 9 (foul water drainage), 10 (surface water drainage), 13 (construction management plan), 14 (boundary treatments), 22 (biodiversity) and 26 (construction programme) of planning permission S/3145/16/FL (Erection of 25 dwellings including 40% affordable along with access car and cycle parking and associated landscaping)
Belsar Farm Meadow Road Willingham CB24 5JL
Submission of details required by conditions 3 (Materials samples), 4 (Landscaping), 6 (Tree Protection), 8 (Contamination), 9 (Foul Water Drainage), 10 (Surface Water Drainage), 13 (Site Management), 14 (Boundary Treatment), 22 (Biodiversity) and 26 (Construction Programme) of permission S/3145/16/FL
Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire
Submission of details required by condition 10 (Hard Landscaping) of planning permission 20/02568/FUL: Notwithstanding the approved plans, no development above slab level shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. Submitted hard landscape details shall include plans, drawings and sections at an appropriate scale together with supporting text and shall include the following: a)Details of all hard landscape areas, including specifications for all proposed hard surfacing, kerbs, edges, ramps and channels, including dimensions, materials, finish, colour and typical construction. b)Details of all changes in levels and junctions between areas of different hard materials. c)Details and specification for all inspection and utilities covers set within hard surfaced areas. d)Details of all street furniture including benches, tree guards, landscape lighting, etc. e)Details of any fencing, including the proposed feature fence to the side boundary of Unit1. Reason: In the interests of the appearance of the completed scheme, as required by South Cambridgeshire Local Plan 2018 Policies HQ/1.
Waterbeach Barracks North Of The Cambridge Reseach Park Roundabout Waterbeach Cambridge Cambridgeshire
Temporary construction haul road including a temporary vehicular access from the A10, construction of a culvert structure, boundary fencing, access gate, signage, wheel wash facilities, construction of engineered drainage works, drainage swale, filter drains, temporary connection to drainage pond, headwalls, soft landscaping, tree and woodland planting, habitat creation and ecological mitigation measures, earthworks, ground remodelling, area for construction use, and any necessary vegetation, tree and hedgerow removal and demolitions.
Downing College Regent Street Cambridge CB2 1DQ
Demolition of existing Butterfield Building and construction of New Student Centre building with extended basement and installation of 16 boreholes and a Ground Source Heat Pump. Associated works to improve hard and soft landscaping areas, construction of new brick wall along northern boundary of site and construction of a bin store. Installation of new cycle parking, tree works and works associated with installation of services and plant.