Waterbeach Barracks Key Phase 1 North Denny End Road Waterbeach Cambridgeshire CB25 9PA
Reserved matters application for approval of access, appearance, landscape, layout and scale in respect of the provision of an electricity substation located in Key Phase 1 North including necessary landscape works and hardstanding, any necessary engineering works, ground remodelling and any demolition following outline planning permission S/0559/17/OL (Outline Planning Application for up to 6500 dwellings (including up to 600 residential institutional units) business retail community leisure and sports uses a hotel new primary and secondary schools green open spaces including parks ecological areas and woodlands principal new accesses from the A10 and other points of access associated infrastructure groundworks and demolition with all matters reserved except for the first primary junction from the A10 and construction access from Denny End Road). An Environmental Statement was submitted to South Cambridgeshire District Council (the Local Planning Authority) with the Waterbeach Barracks outline planning application.
Scrap Yard Willingham Green Road Carlton CB8 0SW
Change of use to residential comprising the demolition of the existing outbuildings and the construction of 2 No. Dwellings and associated access including dropped curbs and landscaping.
Land To The East Of New Road Melbourn Cambridgeshire
S74B application to vary condition 20 of permission S/2791/14/OL (residential development of up to 199 dwellings plus a care home of up to 75 beds new vehicular and pedestrian accesses from New Road public open space and a landscape buffer) to change the approved construction working hours to 06:30 - 21:00 Monday - Friday, 07:30 - 17:00 Saturdays, with no external construction works being carried out outside of the hours of 07:00-18:00 Monday to Friday and 07:30-17:00 on Saturdays and no Sunday or Bank Holiday working for a temporary period of 01/12/2020 to 31/03/2021.
FORMER Mill Road Depot Mill Road Cambridge Cambridgeshire CB1 2AZ
S74B to vary condition 9 of ref 17/2245/FUL (The erection of 182 dwellings (including 50% affordable housing), 51sqm of floor-space consisting of Use Class B1 (Business) or D1 (Non-Residential Institutions) - in the alternative, basement car park (101 spaces), surface water pumping station, open space (including play area), alterations to the junction with Mill Road, together with associated external works including cycle parking and landscaping) to change the construction hours to 08:00 - 18:00 Monday to Friday and 08:00 to 18:00 on Saturday for a temporary period from 05.09.20 to 01.04.2021.