Home Farm Cambridge Road Madingley Cambridgeshire CB23 8AH
Remedial works to boundary, including demolition of remaining wall and erection of boundary party fence. The proposed works comprise of: a) The demolition of the existing brick wall. b) Removal of existing tree roots. c) Construction of new reinforced concrete foundation to finish flush with neighbours ground level. d) Construction of new dwarf brick wall to match height of foundation. e) Installation of new timber fence.
Fomer Gestamp Factory Bourn Airfield St Neots Road Bourn Cambridgeshire
Submission of details required by condition 10 (Hard Landscaping) of planning permission 20/02568/FUL: Notwithstanding the approved plans, no development above slab level shall take place until full details of hard landscape works have been submitted to and approved in writing by the Local Planning Authority. Submitted hard landscape details shall include plans, drawings and sections at an appropriate scale together with supporting text and shall include the following: a)Details of all hard landscape areas, including specifications for all proposed hard surfacing, kerbs, edges, ramps and channels, including dimensions, materials, finish, colour and typical construction. b)Details of all changes in levels and junctions between areas of different hard materials. c)Details and specification for all inspection and utilities covers set within hard surfaced areas. d)Details of all street furniture including benches, tree guards, landscape lighting, etc. e)Details of any fencing, including the proposed feature fence to the side boundary of Unit1. Reason: In the interests of the appearance of the completed scheme, as required by South Cambridgeshire Local Plan 2018 Policies HQ/1.
Waterbeach Barracks North Of The Cambridge Reseach Park Roundabout Waterbeach Cambridge Cambridgeshire
Temporary construction haul road including a temporary vehicular access from the A10, construction of a culvert structure, boundary fencing, access gate, signage, wheel wash facilities, construction of engineered drainage works, drainage swale, filter drains, temporary connection to drainage pond, headwalls, soft landscaping, tree and woodland planting, habitat creation and ecological mitigation measures, earthworks, ground remodelling, area for construction use, and any necessary vegetation, tree and hedgerow removal and demolitions.