54 South View Road Benfleet Essex SS7 5ND
Extend existing front dormer with pitched roof over, new porch and pitched roof over existing garage.
9 Hamilton Close Leigh-on-sea Essex SS9 3RN
Demolition of rear conservatory and construction of single storey rear/side extension and part garage conversion, a hip to gable roof extension with rear dormer and rooflights
30 George Close Canvey Island Essex SS8 9PU
Hip to gable loft conversion including rear dormer and front roof lights plus garage conversion including single storey front extension
3 Cambridge Road Canvey Island Essex SS8 0EU
Loft conversion including double hip to gable roof extensions, front and side rooflights, rear dormer and garage conversion to habitable room
37 Sherwood Crescent Hadleigh Benfleet Essex SS7 2LF
Hip to gable roof extension and extension of existing rear dormer at rear and single storey side/rear extension including the demolition of existing garage
40 Kimberley Road Benfleet Essex SS7 5NQ
Demolish existing conservatory and side dormer and alterations and extensions to first floor to create additional storey and proposed hipped roof over garage and fenestration alterations
12 Oakwood Close Benfleet Essex SS7 5SB
First floor front/side extension above existing garage with pitched roof and loft conversion including rear dormer and skylights
17 Grosvenor Road Benfleet Essex SS7 1NP
First floor side extension over existing garage including stepped gable-roof extension with new pitched roof dormer to front elevation, extension of existing flat roof dormer to rear and proposed change of materials to front existing dormers (revised application)
4 Berkeley Lane Canvey Island Essex SS8 0BT
Demolition of garage, construction of single-storey side extension, roof extension, loft conversion including rear dormer and fenestration additions
17 Grosvenor Road Benfleet Essex SS7 1NP
First floor side extension over existing garage extending gable roof to accommodate new pitched-roof dormer to front elevation and extension of existing flat roof dormer to rear and change of materials to front existing dormers