The Avenue Springfield And Land Forming Part Of Beaulieu Parks Sports Ground Springfield Chelmsford Essex
Construction of a two-way bus link and pedestrian and cycle paths to connect the Beaulieu Park Railway Station to White Hart Lane with utility, landscape and infrastructure works, together with associated and ancillary development
Barns At Woodham Hall Main Road Bicknacre Chelmsford Essex
Conversion of barns to three dwellings including demolition of outbuildings. Construction of cart lodge to Plot 3. Associated landscaping, biodiversity enhancement and operational development.
Land West Of The Fox And Raven Chelmer Village Way Chelmer Village Chelmsford Essex
EIA Screening Opinion - Residential development comprising the construction of 54 affordable homes, provision of open space, landscaping, sustainable drainage, ground re-profiling, formation of bund, cycle and footpath links, vehicular access from Chelmer Village Way.
Brentwood Borough Council Chelmsford Essex CM15 8AY
Land South Of A127 East Of M25 Junction 29 Codham Hall Codham Hall Lane Great Warley Essex - Regulation 25 Submission: Brentwood Borough Council gives notice that further information has been submitted in support of the hybrid planning application with reference 22/00402/FUL, such further information seeking to remove the outline element of the application relating to the M25 to B186 link road (Phase 2) and making alteration to the application site boundary (to remove the outline element and land adjacent to Jax Folly). The following is the revised description of development for the application. Full planning application seeking detailed planning permission for demolition of existing buildings and structures; ground works to enable creation of development plots; highways works including construction of new A127 overbridge, access to B186, site roads and construction of M25 J29 to B186 link road (phase 1), erection of buildings for Class B8 (Storage and Distribution) and/or Class B2 (General Industrial) use within ancillary office space (within Class E); landscaping, infrastructure and enabling works including diversion of public rights of way. The further information relates to the Environmental Statement, including a Statement of Conformity Letter considering the implications for the changes to the red line boundary of the proposed development for the following topics: Socio-economics, Waste and Resources, Traffic and Transport, Air Quality, Noise and Vibration, Ground Conditions, Water Resources and Flood Risk, Ecology, Climate Change and Greenhouse Gas Emissions, Landscape and Visual Impact Assessments and Built Heritage.
Park Farm Belsteads Farm Lane Chelmsford Garden Community Chelmsford CM3 3PX
Details pursuant to Condition 11 (Construction Environmental Management Plan) of planning permission ESS/99/22/CHL. ESS/99/22/CHL was for Temporary compound associated with the operation of the Park Farm mineral extraction area at Bulls Lodge Quarry comprising the parking of contractors plant and machinery, a mobile welfare unit, operatives caravan accommodation, associated car parking and ancillary development and landscaping.
Land East Of St Cleres Hall Pit Main Road Danbury Chelmsford
Variation of condition 26 to approved planning application 21/00081/FUL (Installation of a solar photovoltaic (PV) park generating up to 25 MW of electricity spread over two sites (sited either side of St Cleres Hall Pit), comprising ground-mounted photovoltaic solar arrays together with substation, inverter/transformer stations, site accesses, grid connection cables, internal access tracks, security measures, access gates, other ancillary infrastructure, landscaping and biodiversity enhancements.) to amend the condition to Prior to the commencement of any work on the site, details shall be submitted to the Local Planning Authority to show that a joint inspection of the local road (A414) to be used by construction vehicles has been carried out by the applicant and the Highway Authority. Within 3 months of the first export to the National Grid, details shall be submitted to the Local Planning Authority to show that the A414 has been inspected by the applicant and the Highway Authority after completion of the construction of the development.