Land To The East Of Linacre Road Holme Hall Chesterfield Derbyshire
Discharge of conditions: 3 (Highway improvement works), 4 (Development program), 6 (Highway Construction Management Statement/Plan), 7 (Vehicular access junctions), 8 (Construction details of the estate streets and footways), 11 (Travel plan), 12 (Junction visibility sightlines), 17 (Employment and Training Scheme), 19 (Implementation of coal mining remediation work), 21 (Construction Environmental Management Plan), 22 (Scheme for the investigation and recording of contamination), 25 (Ecological Enhancement Plan), 31 (Tree protection plan and arboricultural method statement), 36 (Proposed street scene), 37 (Contour and attenuation pond details), 38 (Detailed design and associated management and maintenance plan of the surface water for the site), 39 (Assessment to demonstrate that the proposed destination for surface water accords with the drainage hierarchy) and 40 (Additional surface water run-off during construction phase), 41 (Associated management and maintenance plan in line with CIRIA SuDS Manual C753) and 46 (Carbon release reduction scheme) of application CHE/21/00707/FUL- Erection of 301 dwellings including the provision of public open space, landscaping and associated infrastructure and works
Land To South Of Poplar Farm Rectory Road Duckmanton Chesterfield Derbyshire
Discharge of conditions 7 (Details of levels), 8 (Compliance with working hours), 11 (Storage of plant and materials) and 13 (Construction details of estate roads and footways) of application CHE/15/00085/OUT- Outline residential development on 1.38 hectres of land for up to 35 dwellings including means of access