Bell Farm Wexham Park Lane Wexham Buckinghamshire SL3 6LX
Change of use from stables to 1 x one, 1 x two bed flats, barn to 1 x bed mews, garage to 1 x bed bungalow and existing dwelling into 2 x dwellings including external alterations and private amenity space.
1 Higham Road Chesham Buckinghamshire HP5 2AF
Approval of condition 5 (Ecological enhancements) of planning permission PL/21/2468/FA - Alterations to existing building including 2 storey side extension and changes to windows and doors. Conversion of the existing dwelling into 3 separate 1 bed flats.
1 Higham Road Chesham Buckinghamshire HP5 2AF
Alterations to existing building including 2 storey side extension and changes to windows and doors. Conversion of the existing dwelling into 3 separate 1 bed flats.
77 Stomp Road Burnham Buckinghamshire
Approval of condition 12 (contamination) of planning permission 18/00802/RVC (Variation of condion 2 for application no 15/00805/FUL (Erection of 23 dwellings (comprising 3 one bedroom, 1 two bedroom apartments and 19 three bedroom houses), car parking, associated landscaping and ancillary works.): to sub-divide the approved 2-bed apartment into 2 x 1-bed apartments, alterations to design and layout of doors and windows,minor reconfiguration of car parking, and amend units 9 and 10 into mid terrace units.)
Beeches Lodge 24 Britwell Road Burnham Buckinghamshire SL1 8FD
Variation of conditions 4 and 5 of planning permission PL/19/3593/VRC (Variation of condition 16 of planning permission: PL/19/0318/VRC (Variation of condition 5 of planning permission 17/01126/FUL (Redevelopment to form 46 retirement apartments for the elderly including communal facilities, access, car parking and landscaping) to allow the existing buildings to be demolished before details of the traffic calming and signage scheme are submitted to the Local Planning Authority)) to allow for: alterations to the car parking layout, accommodation of additional spaces and minor alterations to the landscaping) to allow occupation of up to 12 dwellings before completion of highway works