Ardwick Lodge Potter Row Great Missenden Buckinghamshire HP16 9LU
Variation of condition 11 (approved plans) of planning permission PL/22/2486/FA (Demolition of existing residential development and the construction of a new dwelling) to allow changes to design, relocation of rooflights and increased roof ridge height
24 Mayflower Way Beaconsfield Buckinghamshire HP9 1UE
Variation of condition 10 (means of access)of planning permission PL/21/4558/FA - Demolition of existing dwelling and redevelopment of site to provide two pairs of semi-detached dwellings (resubmission of PL/21/2395/FA) to allow No occupation of the development shall take place until the new means of access has been sited and laid out in accordance with the approved drawing and constructed in accordance with Buckinghamshire Council guide note Private Vehicular Access Within the Public Highway. The commencement, demolition and construction of development can however take place before this is in place.
Poppins Back Lane Chalfont St Giles Buckinghamshire HP8 4PD
Variation of condition 5 (permitted development rights) and 8 (approved plans) of PL/19/2159/FA (Demolition of existing dwelling and erection of new dwelling) to allow for construction of a basement, increases in ground and first floor areas, addition of 4 side windows and changes to windows and doors, 6 front, 10 side and 2 rear rooflights and 11 side solar panels and an additional vehicular access. Changes to permitted development rights
8 Holtspur Close Holtspur Beaconsfield Buckinghamshire HP9 1DP
Removal of condition 10 ( Permitted Development Rights ) of planning permission 07/00342/FUL (Redevelopment of site to provide 4 detached dwellings with garages. Construction of vehicular access ) to allow for the reinstatement of PD rights.
Burnham Grammar School Hogfair Lane Burnham Buckinghamshire SL1 7HG
Variation of conditions 20 (Drainage) and 24 (Approved plans) of planning permission PL/20/0402/VRC (Variation of PL/19/1742/FA (Demolition of the existing building, construction of three storey building incorporating landscaping, hardstanding, drainage infrastructure and substation. Relocation of outdoor sports facilities and removal of trees)) to allow for a change in the proposed development to rotate the multi-use games area (MUGA) 90 degrees and provide an additional court, and associated changes to landscaping and drainage.