Tirra Lirra 20 Dorney Reach Road Dorney Buckinghamshire SL6 0DX
Variation of condition 8 (Approved plans) of application PL/22/3043/VRC which relates to variations of original permission PL/19/3486/FA (Demolition of existing dwelling. Erection of detached dwelling. Construction of front boundary wall.) to allow for the removal of the middle gable on the rear elevation, addition of rear juliet balcony and alterations to roof including the addition of rooflights.
Union Point Pinstone Way Denham Buckinghamshire SL9 7BJ
Approval of condition 5 (samples or details of materials to be used in the construction of the external surfaces of the development) of planning permssion PL/21/2373/FA - Erection of a two storey residential building with accommodation within the roof to provide 7 x 1 bedroom flats with associated works including landscaping, car parking and partial demolition of existing buildings (as approved under planning permission ref: PL/20/3921/FA).
Shangri La 34 Northdown Road Chalfont St Peter Buckinghamshire SL9 0LQ
Non Material Amendment to planning permission PL/21/3761/FA (Demolition of garage and erection of single storey side and rear extension. Roof alterations to provide living space in loft including raising the ridge height, 2 side dormer windows and 4 side rooflights. Construction of 2 ground floor front bay windows.) to allow for the change of the front bay windows to conventional windows.
Shangri La 34 Northdown Road Chalfont St Peter Buckinghamshire SL9 0LQ
Demolition of garage and erection of single storey side and rear extension. Roof alterations to provide living space in loft including raising the ridge height, 2 side dormer windows and 4 side rooflights. Construction of 2 ground floor front bay windows.
Prestwick Place St Huberts Lane Gerrards Cross Buckinghamshire SL9 7BW
Variation of condition 6 of listed building consent PL/19/2478/HB (Demolition of rear and front extensions and garage and erection of rear single storey extension and two storey front/side extension with glazed link, alterations to rear roof and insertion of a rooflight, and new terraces) to allow use of garage before the second phase of construction begins