100 New Bridge Street London EC4V 6JA
Extension and refurbishment works to the existing building to provide additional Class E office floorspace, comprising (i) extension of the building at 10th floor level to provide an additional floor of office accommodation, (ii) the rationalisation of and increases to the existing massing alongside the demolition of the existing facades and the provision of new facades on the northern, southern and eastern elevations (iii) the rationalisation of the existing office floorplates including the infilling of the atrium (iv) works to ground floor including relocation of primary office lobby and retail units (v) provision of landscaped roof terraces at levels 06, 07, 08 and 09 (vi) the provision of cycle parking and end of trip facilities, and all associated and ancillary works [THE PROPOSED DEVELOPMENT DOES NOT ACCORD WITH THE PROVISIONS OF THE DEVELOPMENT PLAN IN FORCE IN THE AREA IN WHICH THE LAND TO WHICH THE APPLICATION RELATES IS SITUATED]. *RECONSULTATION DUE TO REVISED PLANS*
Newbury House 10 - 13 Newbury Street London EC1A 7HU
Change of use at basement, ground, first, second and third floor levels from hotel (Class C1 use) to a flexible use for either Class C1 or Class C3 purposes to provide seven units of accommodation; Erection of a set-back roof extension for a flexible use for either Class C1 or Class C3 purposes to provide two additional units of accommodation (9 in total); External alterations comprising retention and repair of Newbury Street facade, demolition of the rear facade and its remodelling in brick; the addition of two new (fourth and fifth) floors with amenity spaces enclosed by metal balustrades; and the installation of a sedum roof.
Skinners' Hall 8 Dowgate Hill London EC4R 2SP
Alterations to Skinners Hall including i) demolition of existing pavilion, new glazed pavilion extension, associated roof terrace works and entrance to Court Room, at first floor level; ii) new glazed plant enclosure; iii) extension and mansard to courtyard elevation to provide new accommodation at third floor; iii) modifications to western fa?ade at ground and first floor levels; iv) new entrance from College Street via new opening in existing screen wall, new staircase and platform lift to new lower ground entrance; alterations to the courtyard to provide level access to Skinners Hall and vi) new handrails to existing entrances at 8 and 9 Dowgate Hill.
4 Bream's Buildings London EC4A 1HP
Alteration and extension to the existing building, including: (i) demolition of the existing mansard roof; (ii) erection of a replacement fourth floor and an additional two storey roof extension to provide additional office accommodation (Class B1) (net increase in floorspace: 273sq.m GIA); (iii) erection of a rooftop plant enclosure; (iv) associated works at ground floor level.