65 Gresham Street London EC2V 7NQ
Horizontal extension at 8th and 9th floor levels and three-storey vertical extension plus plant enclosure to create Class E floorspace; alterations and refurbishment to existing windows and facades; structural alterations and repositioning of cores; creation of new and refurbished entrances on Gresham Street and at the junction of Aldermanbury and Love Lane; creation of inset balconies; creation of roof terraces at levels 8, 10 and 12; removal and replacement of plant and installation of PV; public realm improvements for new hard and soft landscaping; removal of ground floor mezzanine level facilitating the provision of retail frontages and retail units to Aldermanbury; provision of cycle storage and other works incidental to the development.
1 Exchange Square London EC2A 2JN
Part demolition of the site for the refurbishment and extension to the existing facade facing onto Exchange square and upper levels; External alterations and improvements to facades facing onto Bishopsgate and at ground floor including new main entrance and new retail frontages; public realm improvements fronting Bishopsgate including new steps, seating and accessibility improvements; Increased height and widening of Exchange Arcade; creation of a new outdoor retail pavilion terrace to level 1; creation of west extension terraces; creation of wing extension terraces; provision of external terraces for occupants at levels 4, 8, 9, 10, 11, 12 and roof terrace on level 13; provision of cycle storage and other works incidental to the development (9,920 sq.m).
26-30 Morley House Holborn Viaduct London EC1A 2AT
Application under Section 73 of the Town & Country Planning Act 1990 to vary Condition 41 (Approved Plans) of planning permission dated 17th August 2020 (Ref. 17/00165/FULMAJ) to enable minor material amendments to the approved scheme including: (1) Amended hotel entrances on Holborn Viaduct; (2) Internal reconfiguration of hotel layout; (3) Internal reconfiguration to provide an internalised access link between the ground floor of the hotel and the office workspace in the lower levels of City Temple; (4) Internal reconfiguration on ninth floor from hotel guestrooms to hotel Restaurant / Bar (private guest only); (5) Alterations to address design development changes to ceiling heights, parapets and roof plant areas; (6) associated amendments to facades; (7) the introduction of a Phasing Plan to allow a phased approach to the development and (8) a revised energy strategy.