Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to the Landscaping and detailed design works (River wall Granite, paving) pursuant to BLABF 5 and BLABF 14 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
100 And 108 Fetter Lane London EC4A 1ES
Submission of details to discharge conditions (22) (I) Ground level surfaces including materials, (22) (m) public route, (22) (h) External Terraces and to discharge Condition (21) Landscaping details of planning permission 21/00454/FULMAJ dated 29th September 2021.
Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR
Partial discharge of schedule 3 requirements relating to the Landscaping works pursuant to BLABF 14 and balustrade, terracing and listed structure interface details pursuant to BLABF 4 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.