14-21 Holborn Viaduct 32-33 & 34-35 Farringdon Street London EC1A 2AT
Demolition of existing buildings at 14-21 Holborn Viaduct, 34-35 and 32-33A Farringdon Street, and construction of a new building arranged over 2 basement levels, ground and 10 upper floors to Holborn Viaduct and 12 upper floors to Farringdon Street to provide a new Commercial, Business and Service (Class E) building; new publicly accessible lift to provide step-free access between Holborn Viaduct and Farringdon Street; hard and soft landscaping works and other works incidental to the development.
115 - 123 Houndsditch London EC3A 7BU
Demolition of existing buildings and construction of a new building comprising four basement levels (plus one basement mezzanine), ground floor plus 23 upper storeys, including office use (Class E), flexible retail / cafe use (Class E); community space (Sui Generis), ancillary basement cycle parking, servicing and plant; new public realm and highway works; and other works associated with the development.
122 Minories And 14 Crosswall London EC3N 1NT
Demolition of the existing retail/office building and construction of a new building (ground plus basement and six upper floors) for use as retail/restaurant (Class A1/A3) and 17 no. dwellings (Class C3) and associated works.
Seal House 1 Swan Lane London EC4R 3TN
Demolition of the existing building and construction of a basement, ground plus 11 storey building for office use (Class B1) (16,084sq.m GIA), retail use (Class A1/A3) at ground (314sq.m GIA), restaurant use (Class A3) at 11th floor level (708sq.m GIA), a publicly accessible terrace at 12th floor roof level (744sq.m) and public realm improvement works together with ancillary parking, servicing and plant and all necessary enabling works.
100 And 108 Fetter Lane London EC4A 1ES
Demolition of 100 and 108 Fetter Lane and construction of a new building for office use (Class E) and a public house comprising a basement level, ground, mezzanine and 12 upper storeys plus roof plant level, creation of a new pedestrian route and pocket square at ground level, ancillary cycle parking, servicing, plant and enabling works.
100 And 108 Fetter Lane London EC4A 1ES
Demolition of 100 Fetter Lane and construction of a new building for office use (Class E) and a flexible commercial unit (Class E(a)(b)(c)(d)), comprising a basement level, ground, mezzanine and 12 upper storeys plus roof plant level, creation of a new pedestrian route and pocket square at ground level, ancillary cycle parking, servicing, plant and enabling works.
20 Fenchurch Street London EC3M 3BY
(i) External alterations and extension to ground floor of existing retail unit (within use class 'E' cafe/restaurant and 'sui generis' drinking establishment), including the construction of external canopy and terrace to first floor of unit (46sq.m); and (ii) Provision of covered visitor canopy to western side of tower.
2-3 Finsbury Avenue London EC2M 2PF
Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and non-residential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development.
1 - 12 Long Lane London EC1A 9HF
Demolition of existing buildings and structures to basement level and construction of a eight storey office (Class B1) building with basement and lower basement with retail (Class A1/A2/A3) at part ground and basement levels together with ancillary cycle parking, associated servicing, plant, amenity terraces, landscaping and other associated works.
Juxon House 100 St Paul's Churchyard London EC4M 8BU
External works on the north elevation comprising the installation of two air ventilation louvre grilles in existing windows on the third floor; and the construction of a new external lobby entrance facing Paternoster Lane projecting 300mm from the existing facade and associated works.