6 Lambert Jones Mews Barbican London EC2Y 8DP
Refurbishment including refitting the kitchen, ground floor bathroom and first floor bathroom and WC. Removal and rebuilding several sections of non-structural internal wall to reconfigure the layout of the ground floor rear bathroom and rear bedroom 2/study. Several internal doors and associated frames on the lower level to be relocated and all doors (accept the door to the former garage) are to be made full height. Temporary non-original timber mezzanine platform in bedroom 4 to be removed.
23 Brandon Mews Barbican London EC2Y 8BE
Alterations to the garage to create a library and bicycle store.
16 Wallside Barbican London EC2Y 8BH
Replacement of garage door. Conversion of garage for residential purposes. Internal demolition and replacement of internal walls. New internal doors, kitchen and bathrooms.