City Temple 31 Holborn Viaduct London EC1A 2DE
Removal of existing mezzanine floor and insertion of replacement floor, alterations to the fenestration on Shoe Lane at pavement level, insertion of an opening in the internalised east elevation of City Temple at lower ground and mezzanine level to facilitate linkage with Morley House, insertion of louvres on the Plumtree Court elevation; enlargement and underpinning existing foundations and additional column foundations; new Atrium junction detail between hotel and City Temple Church; and installation of new plant in association with the change of use of the lower ground and mezzanine floor to office space.
Kings College Maughan Library Chancery Lane London WC2A 1LR
Installation of vertical blade blinds to two office windows and the installation of an acoustic ventilation grille to office partition.
9A Devonshire Square London EC2M 4YN
Internal fit out of fourth floor office including installation of plasterboard and glazed partitions and minor modifications to existing mechanical installation.
4 Frederick's Place London EC2R 8AB
Refurbishment of the existing building for continued office use including the reconstruction of the rear ground extension; new rear terrace; rationalisation of plant equipment; replacement of windows; internal alterations; upgrades to services, fabric repairs and altered decorations; and conversion of the third and fourth floors to ancillary accommodation for The Mercers' Company (as per 15/01308/FULL and 15/01309/LBC).
41 Lothbury London EC2R 7HF
Internal additions and alterations to the existing building to provide new circulation core at ground floor and mezzanine level; refurbishment of existing office floorspace at ground, mezzanine and first floors; alterations to the existing Banking Hall and ground, first and second floors to remove modern additions; relocation of the existing reception desk; installation of new electrical services and routings; and other associated works.
1 Brick Court Middle Temple London EC4Y 9BY
Internal alterations to improve the office, disabled WC and kitchen. This includes taking down and rebuilding two later partitions blocking up one doorway, replacing inappropriate glazing in two sash windows to the kitchen. Further works include replacing lighting and electrical power sources data cabling etc. removal of a modern ceiling light feature in the office. Replacement of existing vinyl sheet and carpet floor finishes.
1B Snow Hill Court London EC1A 2EJ
Internal and external alterations to facilitate change of use of building from office to flexible Class E and/or C2 Residential Institution (Rough Sleeper Assessment Centre), including alterations and refurbishment of listed building (including partial demolition / replacement of existing roof structures and rooflights with new); installation of new external plant and changes to landscaping including creation of covered seating area; installation of new bike stands; and access gate.
5 King William Street London EC4N 7DA
To partially remove a metal stud partition wall, extending an existing open plan office area into a space currently used as a lobby. A new leaf and a half door will be fitted into a new metal stud partition wall between two columns near the upper landing of the left hand side crescent staircase that leads from the ground floor reception to the mezzanine level. This new wall will be set back from the existing ceiling moulding. A new small lobby will be created by a proposed metal stud partition wall constructed between a column and the existing partition lobby wall on the right hand side of the crescent staircase. The relocation of an existing access controlled door will facilitate a new access point from the resized lobby into a client meeting room.
4 Staple Inn London WC1V 7QH
Installation of air conditioning unit in 3 offices on the top floor of 4-6 Staple Inn and installation of external unit in lightwell at the rear of 7 Staple Inn.
9 Devonshire Square London EC2M 4YF
Internal office refurbishment of the existing fifth floor level with the installation of new internal partitions, suspended ceilings and floor finishes.