1 Broadgate London EC2M 2QS
Submission of details of: (b) details of the proposed new facade(s) including typical details of the fenestration and entrances; (c) details of a typical bay of the development; (e) details of the ground floor office and retail entrances; (f) details of soffits, hand rails and balustrades; and (l) details of the entrance canopies pursuant to condition 24 of planning permission 20/00462/FULL dated 30.03.2021.
6 More London Place London Southwark
Installation of a telecommunications base station comprising 6 no antennas, 2 no 300mm dishes together with 1 no equipment cabinet and proposed 2 no Flatpack frames on proposed steelwork support frame and ancillary development thereto.
15 - 16 Minories London EC3N 1BL
Submission of the final Local Procurement Strategy in relation to the residential development pursuant to schedule 3, paragraph 9.7 of the Section 106 agreement dated 29 August 2023, planning application reference 21/00271/FULMAJ.
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details for (i) a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 12; (ii) a Base-Line Terrestrial Television and Radio Interference Study to assess terrestrial television and radio reception to residential properties in the vicinity of the site pursuant to condition 14; and (iii) full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement, that demonstrates that the development is designed to meet the relevant targets set out in the GLA Circular Economy Statement Guidance pursuant to condition 21(a) of planning permission 22/00790/FULEIA dated 24/05/2023.
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Development Programme pursuant to Schedule 3, Paragraph 8.4 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Site Bounded By 34-38, 39-41, 45-47 & 57B Little Britain & 20, 25, 47, 48-50, 51-53, 59, 60, 61, 61A & 62 Bartholomew Close, London EC1
Submission of details of a post construction assessment of the residential development demonstrating that a Code of Sustainable Homes target rating of Level 4 has been achieved pursuant to Condition 52 (part, Phase 3) of planning permission dated 16.03.2017 (ref: 16/00165/FULMAJ).
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane London EC3M 3JY
Submission of details of monitoring during the pre-demolition, demolition, temporary and permanent foundation works, and construction phases of the development pursuant to part (c) of condition 26 (in part) of planning permission 19/01307/FULEIA dated 23rd September 2021.
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane London EC3M 3JY
Submission of details of monitoring during the pre-demolition, demolition, temporary and permanent foundation works, and construction phases of the development pursuant to part (c) of condition 6 (in part) of listed building consent 19/01283/LBC dated 23rd September 2021.
1 Stonecutter Street London EC4A 4TR
Submission of details of the integration of window cleaning equipment and the garaging thereof, plant, flues, fire escapes and other excrescences at roof level; and details of the arrangements for the provision of refuse storage and collection facilities within the curtilage of the site to serve each part of the development pursuant to conditions 23(l) and 23(q) of planning permission reference 18/00878/FULMAJ dated 28/03/2019.
61-65 Holborn Viaduct London EC1A
Request for comment by the Local Planning Authority on the disposal of areas to be used for piling and columns, and airspace above the columns, in the Network Rail tunnel between City Thameslink and Farringdon stations, passing under 61-65 Holborn Viaduct, in respect of development granted under 21/00781/FULMAJ.