81 Newgate Street London EC1A 7AJ
Part refurbishment and part demolition, excavation and redevelopment involving the erection of an additional three storeys to provide a ground plus 13 storey building with a publicly accessible route through the site, incorporating ancillary office uses at basement levels, retail (Use Class E (a) (b) (c) (d) (e) (f) (g)) at ground floor level and access to offices, office accommodation from levels 1-13 (Use Class E (g)) with privately accessible roof terraces, landscaping and other associated works. (For information: This application is a revised re-submission of application 20/00311/FULMAJ as amended).
Friary Court 65 Crutched Friars London EC3N 2AE
Demolition of existing building and redevelopment of the site for a new building comprising basement, ground plus 20 upper floors (+74.9m AOD) for purpose built student accommodation (769 rooms) and associated amenity space (Sui Generis); Museum use at part ground, first and second floor levels (Use Class F1(c))(+3101sq.m GIA); hard and soft landscaping; ancillary plant and servicing; and associated works.
61 - 65 Holborn Viaduct London EC1A 2FD
Redevelopment of the site for a new building comprising two basement levels, lower ground, ground plus 12 upper floors including purpose built student accommodation and associated amenity space (Sui Generis), flexible cultural / community use at part ground and lower ground floor levels (Sui Generis), a publicly accessible roof terrace, a pedestrian route through the site, hard and soft landscaping, together with ancillary plant and servicing; and associated enabling works.
Site Bounded By Fenchurch Street, Mark Lane, Dunster Court And Mincing Lane. London EC3M 3JY
i) Demolition of 41-43 Mincing Lane, 40-54 Fenchurch Street, former church hall and the Clothworkers' Hall and its redevelopment to provide a new building comprising four levels of basement (including a basement mezzanine level), ground, mezzanine, plus part 9, 31 and 35 storeys plus plant containing offices (B1) and flexible shop/financial and professional services/cafe and restaurant uses (A1/A2/A3) at ground floor level; and flexible shop/cafe and restaurant/drinking establishment uses (A1/A3/A4) at levels 10 and 11, including winter garden (Sui Generis); ii) Reprovision of the Clothworkers' accommodation (Sui Generis) within part ground, part first, part second and part third floors and four levels of basement (including a basement mezzanine level); iii) Creation of ground level public access to level 10 roof garden and basement level 1 to Grade II Listed crypt; iv) Dismantling, relocation and reconstruction of the Lambe's Chapel Crypt to basement level 1 and associated exhibition accommodation (Sui Generis) (listed Grade II); v) Alterations to and conservation of the Grade I Listed Tower of All Hallows Staining; vi) Provision of new hard and soft landscaping and other associated works.
10 Lower Thames Street London EC3R 6AF
Creation of new entrance to provide access to new office accommodation at basement level; installation of an external platform lift; and landscaping.
81 Newgate Street London EC1A 7AJ
Part refurbishment and part demolition, excavation and redevelopment involving the erection of an additional four storeys to provide a ground plus 13 storey building with publicly accessible route through the site, incorporating gym and swimming pool (Use Class D2) at basement levels, gym and flexible floor area uses (Use Classes A1-A5, B1, D2) at basement level, retail (A1-A5) at ground floor level with access to offices and rooftop restaurant and public viewing gallery, office accommodation (Use Class B1a) from levels 1-13, roof top restaurant (Use Class A3) and publicly and privately accessible roof terraces, landscaping and other associated works.