Boundary House 7 - 17 Jewry Street London EC3N 2EX
Demolition of the building and the erection of a basement, ground plus part 14 storey and part six storey building plus plant comprising of a 311 bedroom hotel with a ground floor cafe/bar and roof top restaurant (Use Class C1) and office floorspace (Use Class E) at part ground and part first floor with ancillary community uses, hard and soft landscaping, cycle parking and associated works.
8 - 12 New Bridge Street London EC4V 6AL
Partial demolition of Fleet House and full demolition of St Bride's Tavern Public house (retention of basement levels) and the erection of a part replacement building with roof extension to provide an 8 storey building for office use (Class E) at levels 1-8, with office lobby (Class E) and commercial space (Class E) at ground floor and mezzanine level, and public house (sui generis) at ground floor level and part basement level; new pedestrian and servicing route from St Brides Lane to Bridewell Place.
60 Upper Thames Street London EC4V 3AD
Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission (application no. 11/00572/FULMAJ) dated 20 March 2012 for the "Demolition of existing buildings and the construction of a new 224 bedroom hotel (Class C1) and 9 residential apartments (Class C3) utilising existing foundations and the provision of a new section of Riverside Walkway (Total floorspace: 21,138sqm)" to amend Condition 41 (Approved Drawings) to introduce curtain walling to the Little Trinity Lane elevation of the building.
20 Giltspur Street London EC1A 9DD
Submission of details relating to: (i) an updated material audit of the building or elements to be demolished; (ii) pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement pursuant to Conditions 2 and 3A of planning permission dated 14.09.2023 (ref: 22/00867/FULMAJ).
Bevis Marks House 24 Bevis Marks London EC3A 7JB
Retrospective post-demolition submission of the Highways Schedule of Condition Survey pursuant to Schedule 3 Paragraph 9.1 of the S106 Agreement dated 22 November 2018 (Planning Application Reference: 17/00330/FULMAJ).
9 - 10 Tokenhouse Yard London EC2R 7AS
Partial demolition of the existing building and redevelopment behind partially retained facades to provide upgraded office accommodation comprising basement, lower ground, ground and five upper floors with rooftop plant.
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details for (i) a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 12; (ii) a Base-Line Terrestrial Television and Radio Interference Study to assess terrestrial television and radio reception to residential properties in the vicinity of the site pursuant to condition 14; and (iii) full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement, that demonstrates that the development is designed to meet the relevant targets set out in the GLA Circular Economy Statement Guidance pursuant to condition 21(a) of planning permission 22/00790/FULEIA dated 24/05/2023.
1 Undershaft London EC3A 8EE
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of a site including 1 Undershaft. The proposals involve the demolition of the existing building and the construction of a ground plus 74 storey building for office use (Class E, up to approximately 109,980m²), retail, and food and beverage facilities (Use Class E, up to approximately 2,590m²) viewing gallery and education spaces (up to approximately 2,450m²). Plus, the provision of a new servicing access and public realm and highways alterations including the provision of raised publicly accessible podium at level 10.
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3, Paragraph 3.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Bevis Marks House 24 Bevis Marks London EC3A 7JB
Retrospective post-demolition submission of the Local Training Skills and Job Brokerage Strategy (Demolition) relating to Schedule 3, Paragraph 3.2 of the Section 106 Agreement dated 22nd November 2018, reference no. 17/00330/FULMAJ.