2 Burgon Street London EC4V 5DR
(i) Change of use of the upper floors from office (Class E) to residential (Class C3) to create four residential units; (ii) Remodelling of third floor and erection of an additional storey to roof; (iii) Replacement of existing entrance to provide separate entrances; and (iv) installation of door and balustrades to rear first floor terrace.
68 King William Street London EC4N 7HR
(i) Erection and extension of canopy structure; (ii) Infill of roof top area to provide for WCs, bar and back of house service area; and (iii) Painting of whole roof top canopy structure and solid infill wall.
200 Aldersgate Street London EC1A 4HD
Formation of an opening and erection of a bridge connecting the office building with the existing courtyard.
Liverpool Street Railway Station Liverpool Street London EC2M 7PY
Erection of a temporary scaffolding system to facilitate the forthcoming roof replacement at London Liverpool Street Station.
6 Lloyd's Avenue London EC3N 3AX
Erection of an internal partition to the front left unit of the first floor.
Barbican Arts And Conference Centre Silk Street London EC2Y 8DS
Erection of a temporary movable shed to facilitate games/activities and provide non-alcoholic refreshments for the summer pop-up picnic garden associated with the lakeside area adjacent to Barbican Arts Centre.
Newbury House 10 - 13 Newbury Street London EC1A 7HU
Change of use at basement, ground, first, second and third floor levels from hotel (Class C1 use) to a flexible use for either Class C1 or Class C3 purposes to provide seven units of accommodation; Erection of a set-back roof extension for a flexible use for either Class C1 or Class C3 purposes to provide two additional units of accommodation (9 in total); External alterations comprising retention and repair of Newbury Street facade, demolition of the rear facade and its remodelling in brick; the addition of two new (fourth and fifth) floors with amenity spaces enclosed by metal balustrades; and the installation of a sedum roof.
Site Bounded By King William Street, Cannon Street, Abchurch Lane & Nicholas Lane London EC4N 7TW
Erection of single storey roof extension at seventh floor level to provide office (Use Class E(g)) floorspace; the creation of a roof terrace at seventh floor level and installation of plant and photovoltaic panels above the seventh floor level; internal and external works at sixth floor level to facilitate the seventh floor extension; and associated works.
120 Fleet Street London EC4A 2BE
Demolition of the existing River Court building at 120 Fleet Street, including part demolition of the basement and the erection of a new building comprising two basement levels and ground floor plus 20 upper storeys (93.15m AOD) including retail, commercial, office and service use (Class E). Creation of new pedestrian routes. Change of use of Daily Express Building from office (Use Class E) to learning and non-residential institutions use (Class F1), retail, flexible learning and non-residential institutions and commercial use (Class E), Alterations to and refurbishment of the existing Grade II* listed Daily Express Building at 120 Fleet Street, including works to detach the building from the River Court with demolition of part of linking floorplate and structure from basement level 01 to level 06, demolition of roof and installation of new roof with associated roof garden, erection of new north facade, retention of south-east curved corner and part demolition of existing east facade from ground level to level 05, erection of new facade and shopfront and associated works.
120 Fleet Street London EC4A 2BE
Alterations to and refurbishment of the existing Grade II* listed Daily Express Building at 120 Fleet Street, including works to detach the building from the River Court with demolition of part of linking floorplate and structure from basement level 01 to level 06, demolition of roof and installation of new roof with associated roof garden, erection of new north facade, retention of south-east curved corner and part demolition of existing east facade from ground level to level 05, erection of new facade and shopfront, demolition of level 06 landing and extension to existing oval staircase to provide access to new roof with new core on north side incorporating new lift between roof top level and basement level 01, installation of new staircase between rooftop level and basement level 02, demolition of mezzanine at basement level 01, removal of internal partitions and associated works.