Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
33 St James's Square London SW1Y 4JS
Amendments to planning permission dated 30 October 2020 (RN:20/03222/FULL) for partial demolition and reconstruction of enlarged rear extension with additional storey; formation of terraces at ground, fourth, fifth and sixth floor levels; excavation to extend existing basement level; installation of plant machinery; internal alterations including installation of new grand stair; and associated external alterations in connection with increase in office floorspace (Class B1). Namely, to add a condition 26 to enable the development to be brought forward in phases and to amend the wording of conditions 12 and 25 to reflect this.
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical Center(Class E (e), in new buildings ranging from 6-15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
Development Site At 161 - 237 Kensington Church Street And 39-41 And Newcombe House 45 Notting Hill Gate Royal Borough Of Kensington And Chelsea London
Partial retention, refurbishment and extension of the Newcombe House tower for continued office use (Class E(g)(i)), the full demolition of the rest of the site comprising existing retail (Class E) and housing (Class C3) uses and surface level car park, and redevelopment to provide retail use (Class E) at ground floor and office use (Class E(g)(i)) at the upper floors, housing (Class C3) and a medical centre (Class E (e)), in new buildings ranging from 6 - 15 storeys with double basement, public realm works and other ancillary works (MAJOR DEVELOPMENT).
Parliamentary Estate Parliament Street London SW1A 2NU
Partial demolition of the 1980s extension with infilling of existing terrace space at 43-44 Parliament Street and development of a new facade to the Canon Row elevation; a new roof and mansard on 1 Parliament Street and 2-4 Canon Row; refurbishment of Bridge Street buildings; and alterations to ancillary residences to provide further accommodation for parliamentary uses (Sui Generis); associated temporary construction works. (Linked to 19/08290/LBC). REVISED SCHEME: including amendments to Canon Row facade, roof plan and form, pitch of Parliament Street mansard roof extension to north and northern lift overrun; increase in area of photovoltaics. RE-CONSULTATION following receipt of Addendum to originally submitted Environmental Statement (ES) and further information (EIA Reg 25) including updates to ES: Ch 4 Approach to assessment, Ch 6 Townscape & Visual Impact, Ch 7 Cultural Heritage, Ch 12 Ground Conditions, Ch 13 Cumulative Impacts
Parliamentary Estate Parliament Street London SW1A 2NU
Partial demolition of the 1980s extension with infilling of existing terrace space at 43-44 Parliament Street and development of a new facade to the Canon Row elevation; a new roof and mansard on 1Parliament Street and 2-4 Canon Row; refurbishment of Bridge Street buildings; and alterations to ancillary residences to provide further accommodation for parliamentary uses (Sui Generis); internal and external refurbishment, including installation of new building services; secondary glazing; and interiors; creation of new openings; and refurbishment of basement vaults, and associated works including temporary construction works. (Linked to 19/08287/FULL) REVISED SCHEME: including amendments to Canon Row facade, roof plan and form, pitch of Parliament Street mansard roof extension to north and northern lift overrun; increase in area of photovoltaics; internal amendments.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
17 Belgrave Square London SW1X 8PG
Demolition of annexe building and replacement with rear extensions to 17 Belgrave Square and excavations to create pool hall extension under garden of 17 Belgrave Square and basement beneath mews property; all in connection with the use of the mews property and 17 Belgrave Square as two single family dwelling houses. (Confirmation it is lawful to continue with the development allowed by planning permission dated 13 December 2019 RN: 18/01324/FULL).
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
45 Foubert's Place London W1F 7QH
Variation of Condition 1 of planning permission dated 5th November 2021 (RN: 20/07701/FULL) for, 'Demolition of the existing fourth floor roof structures and erection of two storey roof extension to create new fourth and fifth floor level (including plant and roof terraces); all to enlarge office building (Class E). Alterations to front (western facade), installation of new windows throughout and associated alterations'; Namely, to make the following amendments to the approved development - internalisation of stair and associated adjustments to roof layout. (Application under Section 73 of the Act).