Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
65 Gresham Street City Of London London EC2V 7NQ
Horizontal extension at 8th and 9th floor level; extensions at upper levels to create four new storeys plus plant enclosure to create Class E floorspace; alterations and refurbishment to existing windows and facades; structural alterations and repositioning of cores; creation of new and refurbished entrances on Gresham Street and at the junction of Aldermanbury and Love Lane; creation of inset balconies and roof terraces at levels 8, 10 and 12; , removal and replacement of new plant and installation of PV; public realm improvements for new hard and soft landscaping and the provision of retail frontages and retail units to Aldermanbury; provision of cycle storage and other works incidental to the development. RECONSULTATION following new plans and documentation received on 12.05.2023 for the reduction in massing of the proposed scheme.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Development Site At 14 To 17 Paddington Green London
Amendments to planning permission dated 5th January 2023 (RN:22/03790/FULL) for Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 15 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. NAMELY the removal of the loggia/covered walkway area between Blocks G and H, the re-design of the layout of the restaurant at the ground floor of Block H and design changes to the façade/elevation of the restaurant extension.
Development Site At 14 To 17 Paddington Green London
Variation of condition 1 of planning permission dated 29 March 2019 (RN: 18/08004/FULL), which itself Varied condition 1 of planning permission dated 21 December 2017 (RN: 16/11562/FULL) for the Demolition and redevelopment of 14-16 Paddington Green; alteration and partial demolition of 17 Paddington Green; development of land to the east and south of 14-17 Paddington Green (part of site known as 'West End Green') to provide buildings ranging between 4 and 14 upper storeys to provide residential units, with associated landscaping, basement car and cycle parking and servicing provision. Namely, to allow addition of one floor of residential accommodation to Block G and to parts of Block H to add residential units and to reduce carbon offset payment to allow connection to Church Street District Heating Scheme. NAMELY to re-plan block G and H to allow senior living accommodation in block G; associated external alterations including a single storey loggia and extension within the courtyard; associated residential amenities to ground floor and part basements of block G and part H; reduction in units from 216 - 203; introduction of PV panels on the roof of Block G; revised landscaping.
St Johns Church Kilburn Lane London W10 4AA
Variation of conditions 1 (and in turn conditions 3, 7, 9, 13, 16, 17, 20) of planning permission dated 21st December 2020 (RN:20/04245/FULL) for the Refurbishment and extension of the Old Vicarage building to convert existing boarding accommodation to provide 5 residential (C3) units; erection of new two storey residential block (plus basement) to the north comprising 4 houses with associated car and cycle parking and landscaping; demolition of sub station and replacement with part single, part two storey school building (Use Class D1) comprising classrooms, ancillary office (Site relates to Bales College). Namely, to add a Phasing Plan to phase the development.
65 Gresham Street City Of London London EC2V 7NQ
Horizontal extension at 8th and 9th floor level; extensions at upper levels to create four new storeys plus plant enclosure to create Class E floorspace; alterations and refurbishment to existing windows and facades; structural alterations and repositioning of cores; creation of new and refurbished entrances on Gresham Street and at the junction of Aldermanbury and Love Lane; creation of inset balconies and roof terraces at levels 8, 10 and 12; , removal and replacement of new plant and installation of PV; public realm improvements for new hard and soft landscaping and the provision of retail frontages and retail units to Aldermanbury; provision of cycle storage and other works incidental to the development.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
17 Wilton Crescent London SW1X 8SA
Confirmation that planning permission dated 8th September 2014 (RN: 14/03923/FULL) has commenced on 31 August 2017 before the expiry of the three year time period and it is lawful to continue with this development for the 'excavation to create basement extension and lower pavement vaults; removal of existing extensions and replace with extensions at rear lower ground to third floor level including roof terrace at rear first floor level; erection of fourth floor extension in mansard style to rear and open up blind windows to front; installation of plant within mansard structure; new landscaping to garden and replace boundary wall with 16 Wilton Crescent'.