32B Abbey Road London NW8 9AX
Conversion of existing garage into a habitable accommodation; construction of ground floor rear extension with roof light; roof light on front elevation; enlarged rear dormer window; and alterations to windows and doors.
25 Blomfield Road London W9 1AA
Excavation of basement level beneath footprint of existing house with walk on rooflights; Rebuilding of bathroom extension at lower ground floor; Erection of extension at ground floor level over octagonal wing and creation of new parapet; Erection of infill extension on northeast elevation; Remodelling of bay on southeast elevation at lower ground floor level; Erection of replacement dormer; Demolition of existing retaining walls on south east elevation and eastern lightwell and construction of new metal escape stairs in these location; Replacement of windows; Rationalisation of drainage, repair of stucco render, repair/ refurbishment and part replacement of existing roof, refurbishment/ replacement of existing chimney and pots; Installation of Plant Machinery; Erection of bin and bike store to front garden; and associated external alterations.
96A St John's Wood Terrace London NW8 6PP
Demolition of existing single storey, flat roofed rear extension which sits between lower and upper floor levels and the erection of a larger rear extension with a mansard roof to create a two storey internal space. At roof level of the main building, construction of a new dormer to the west facing pitch and the enlargement of the existing east facing dormer, both with rooflights. New rooflight is proposed to the front roofslope.
28 Sutherland Street London SW1V 4LA
Construction of mansard roof extension with rear terrace to rear closet wing and dormer extension to side of existing roof extension to provide additional residential accommodation. Alterations to existing rear dormer.
25 Blomfield Road London W9 1AA
Excavation of a new basement beneath the footprint of the existing house with 2x walk on rooflights to provide light down into basement, rationalisation of the current LGF bathroom extension abutting the front entrance porch, relocating of rooflight on the existing entrance porch, rebuilding and replacement of the terrace slab above the Octagonal wing and creation of a new parapet, rebuilding of curved bay on south east elevation to a rectangular bay, demolition of existing retaining walls on south east elevation and eastern lightwell and construction of new metal escape stairs in these locations, replacement of fenestration throughout property, replacement of existing dormer, rationalisation of drainage, repair of stucco render, repair/ refurbishment and part replacement of existing roof which is in poor condition, refurbishment/ replacement of existing chimney and pots, provision of an external bin store.
7 Caroline Place London W2 4AW
Construction of a rear infill extension to existing ground floor projection, alterations to existing ground floor extension including louvres above roof glazing extension, changes to garden elevation of garage; installation of rooflights and dormer windows to roof level to allow for additional living accomodation; installation of additional windows to ground and 1st floor side and rear elevations.
Flat 3 118 Bravington Road London W9 3AL
Construction of a dormer extension in the rear roof slope with the insertion of 3no. rooflights in the front roof slope, and the replacement of the rear window above the staircase.
36 Marlborough Place London NW8 0PD
Excavation and construction of extension at lower ground floor, including erection of a new conservatory to east elevation, erection of new dormer and new rooflight, installation of two French doors and Juliet balconies to east elevation, landscaping of garden and associated works.
1 Hall Gate London NW8 9PG
Construction of a rear dormer extension.
26 Springfield Road London NW8 0QN
Variation of conditions 1, 5 ,11 and 12 attached to the planning permission dated 25 January 2019 (RN 18/10192/FULL) which varied the original planning permission dated 17 April 2018 (RN 17/09039/FULL) for: the Demolition of existing workshop to side of building, excavation of basement with rear lightwells, erection of side and rear extensions at lower ground floor level and two dormers to side and rear at roof level ; NAMELY, to vary the wording of condition 5 in respect of the side dormer as building , other external changes to the consented design , compliance with Appendix A of the Code of Construction Practice , and replacement tree planting .