Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23 December 2022 (RN: 22/05428/FULL) for 'Two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment', NAMELY to enable the removal of specified louvres, relocation of the generator, façade updates at ground floor level, installation of safety balustrading, relocation of the consented UKPN access, creation of a separate ground floor access for the crown amenity space and installation of additional sliding doors at Level 30.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. Namely, amendments to rooflights at Level 5 and 6 of the George Street residential building, and minor elevations alterations.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY; for the installation of planters to the Juliet balconies at first and second floors along George Street.
Portland House Bressenden Place London SW1E 5BH
Amendments to planning permission dated 23rd January 2023 (RN: 22/05428/FULL) for two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment, namely to amend the wording of Condition 3 (Code of Construction Practice) to enable early works to be carried out in accordance with the Appendix A dated 22/11/22 signed by the Environment Inspectorate and prior to the discharge of Condition 3.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 1st October 2021 (RN:20/06914/FULL) for, 'Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works'. Namely, Works to the building, including changes to the East Elevation façade including additional non-openable windows, changes to the layout of the ground floor retail units, refurbishment of the roof, and other associated works
Portland House Bressenden Place London SW1E 5BH
Two-storey extension including roof-level plant along the Bressenden Place façade to provide a new office entrance pavilion (Class E), the provision of Class E office / retail accommodation, remodelling of the crown of Portland House and creation of a setback rooftop extension to provide office amenity (Class E) and an outdoor terrace, reconfiguration of the second floor plant accommodation fronting Cardinal Place, relocation of the zephyr on Bressenden Place, provision of cycle parking, public realm and associated works including window replacement and the application of a new façade treatment.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Amendments to planning permission dated 01 October 2021 (RN: 20/06914/FULL) for the: Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works. NAMELY, to allow alterations to facade of 19- 35 Baker Street- Baker Street Office Building (Building C) at ground, first, fifth, sixth, seventh, eighth and roof level; amendments to 88-110 George Street, including 112 George Street (Building D) at lower ground floor, ground floor, first, fifth, sixth, seventh, eight and roof level; and changes to condition 42 to read : "You must apply to us for approval of a detailed external lighting strategy which includes details of all light fittings and lighting levels. You must not start any work on this part of the development until we have approved what you have sent us. You must then install all lighting in accordance with the approved external lighting strategy".
20 Carlton House Terrace London SW1Y 5AN
Amendments to planning permission dated 16th March 2021 (RN: 20/04933/FULL) for Demolition of existing mansard roof and roof level plant and construction of two storey vertical roof addition with extensions at fourth, fifth, sixth and seventh floor levels for additional office (Class B1) floorspace. Use of the lower ground and basement level 1 for flexible/alternative office (Class B1)/retail (Class A1)/leisure uses (Class D2); namely, to amend wording of condition 32 to allow removal of existing planting and trees at first floor level in advance of approval of a new/replacement hard and soft landscaping scheme for the first floor.
Dev Site At 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street And 30 Gloucester Place London
Variation of conditions 1, 31 and 35 of planning permission dated 4 March 2020 (RN 19/06767/FULL) (amended by 20/05397/NMA) which permitted the following development : Demolition of the existing buildings at 19-35 Baker Street, 88-110 George Street, 69-71 Blandford Street and redevelopment to create a mixed use scheme providing commercial uses and up to 51 residential units within a new ground plus nine storey building (and an enclosed plant area) on Baker Street; a new stepped ground plus four to ground plus six storey building on George Street; refurbishment, extension and the change of use of the first floor from office to residential at 30 Gloucester Place; creation of a single storey basement level linking the Baker Street and George Street buildings to provide car and cycle parking, refuse and servicing; creation of a new central, publicly accessible courtyard; removal of 5 trees and replacement trees across the site, a new publicly accessible route at ground level connecting Baker Street and Gloucester Place; associated plant, landscaping, replacement pavements in part and other associated works NAMELY, to allow alterations including alterations at ground floor level and at 10th floor roof level including a new roof top room, roof terrace and alterations to plant enclosure at 19-35 Baker Street, new risers at 3rd floor to roof level at 30 Gloucester Place, introduction of increased flexibility to the commercial units across the ground floor and to remove the existing tree situated directly to the front of the newly approved entrance and replace it with a new tree to the south-west corner of Gloucester Place.
Old War Office Whitehall London SW1A 2EU
Amendments to planning permission dated 19 March 2018 (17/09368/FULL) for Variation of Conditions 1, 13, 16, 7(a), 9, 38 & removal of Condition 40 of planning permission dated 10 July 2017 (16/09548/FULL) for; Alterations to the existing building including creation of new entrances; alterations to bottle balustrades & parapets; extensions to create three additional storeys; two additional basement storeys; partial demolition & reconstruction of the central wing; demolition, reconstruction & extensions to the Triangular Courtyard facades; external alterations to Quadrangle facades; creation of external terraces at fourth, fifth, sixth & seventh floor levels; addition of entrance canopies; alterations to security walls & bollards & the removal & replacement of street trees; all in connection with change of use from offices (Class B1) to a hotel (Class C1) comprising up to 125 hotel bedrooms/suites with flexible hotel/retail/restaurant/bar use at part ground floor (Class C1/A1/A3/A4), flexible hotel/restaurant use at part lower ground, part ground & part second floors (Class C1/A3); flexible hotel/bar use at part fifth & part sixth floors (Class C1/A4); flexible retail, leisure, restaurant or bar use at part ground floor (Class A1/D2/C1/A3/A4), leisure/spa facilities within the basement levels & part lower ground floor (Class D2/C1) ancillary ballroom, event space & meeting rooms, food & beverage facilities, back of house facilities & associated car & cycle parking & servicing facilities; creation of up to 88 residential dwellings (Class C3) with ancillary communal amenities, & associated car parking, cycle parking & servicing facilities; namely, amendments to the Quadrangle courtyard paving, amendments to internal layout of two residential units; installation of additional windows to fifth floor; installation of external grilles to the east and north elevations.