72 Hamilton Terrace London NW8 9UL
Variation of conditions 1,11, 16, 22, 24, 25 of planning permission dated 30th June 2020 (RN 19/09318/FULL) for the demolition of two-storey coach house (72) and building behind retained front facade at 74, for the construction of new five storey building to provide 7 residential flats. Excavation of basement, demolition of existing rear garages and the erection of 2 additional residential dwellings including associated landscaping. NAMELY, to make minor material amendments including; rationalised front landscaping; moving the access to the rear from the southern side of the building to the northern side; adding skylights above the side wings; adding skylights to rear dwellings; making the lower ground floor rear terraces slightly deeper; making the second floor balcony slightly wider; making the ground floor railings wider (though no increase in terrace size); and adding three windows to south and north flank wall and reinstating the existing Juliette balconies to the front elevation.
26 St James's Square London SW1Y 4JH
Amendments to planning permission dated 8 October 2019 (RN: 19/06149) for: External alterations to the St James's Square and Pall Mall facades, including alterations to windows and entrances, new entrance from Pall Mall and cleaning of brickwork; erection of roof extension to incorporate lift overrun, roof access, concealed open plant area and new plant; and dual/alternative use of part of the ground and basement levels as either office (Class B1) or retail (Class A1); and associated works. Namely, amendments to entrances and doors on the St James's Square and Pall Mall elevations; changes to the lower ground floor layout; alteration to the level 5 facade (to Pall Mall) moving 50mm south towards Pall Mall; alteration to the construction of the mansard roof moving 240mm south toward Pall Mall; the introduction of a short boundary wall to St James's Square; changes to the design of the railings; amendments to the quantum and height of the stall risers, amendments to the stone bands on the facade; and variation to the wording of conditions 12 and 13 requiring the works to be carried out in accordance with the detailed drawings of the new windows, doors and eastern party wall upstand.