Development Site At Former Whiteleys Centre Queensway London W2 4YN
`Display of externally illuminated Christmas lights on trees, and construction hoarding along Queensway for a temporary period from 13 November 2023 to 6 January 2024.
2 Providence Court London W1K 6PR
Temporary display of an advertisement wrap, around the steel facade retention structure which is to be temporarily erected in front of the facade elevation of 2 Providence Court during the construction stage until 31 October 2022.
The National Gallery Trafalgar Square London WC2N 5DN
Display of hoarding measuring 3m x 88.52m (total) with 23 construction site safety lights.
Marylebone Institute School House 29 Cosway Street London NW1 6TH
Display of a non-illuminated construction hoarding measuring 2.4m X 209.7m for a temporary period of six months between 27 March 2022 and 27 September 2022.
Development Site At Former Whiteleys Centre Queensway London
Display of externally illuminated Christmas lights on trees and construction hoarding along Queensway for a temporary period.
1 Knightsbridge London SW1X 7LX
Display of non illuminated signage on the existing construction hoarding measuring 1.22mm x 2.44mm and 1.83mm x 0.76mm for a temporary period from 14.09.2021 until 31.12.2022
23 Great Marlborough Street London W1F 7HU
Display of non-illuminated adverts to construction hoardings on Great Marlborough Street and Argyll Street, for a further temporary period until 10 May 2021, together with applied vinyl graphics to ground and first floor windows for a further temporary period until 1 July 2021 and new vinyl graphics to ground floor windows for a temporary period until July 2021.