8 Lancelot Place London SW7 1DR
External alterations, including demolition of the existing glazed entrance box, remodelling entrance and introduction of fenced courtyard garden to Lancelot Place ground floor facade; new terrace at Level 6 and 7 on Brompton Road facade; and new plant and plant screen at main roof level.
25 Blomfield Road London W9 1AA
Excavation of basement level beneath footprint of existing house with walk on rooflights; Rebuilding of bathroom extension at lower ground floor; Erection of extension at ground floor level over octagonal wing and creation of new parapet; Erection of infill extension on northeast elevation; Remodelling of bay on southeast elevation at lower ground floor level; Erection of replacement dormer; Demolition of existing retaining walls on south east elevation and eastern lightwell and construction of new metal escape stairs in these location; Replacement of windows; Rationalisation of drainage, repair of stucco render, repair/ refurbishment and part replacement of existing roof, refurbishment/ replacement of existing chimney and pots; Installation of Plant Machinery; Erection of bin and bike store to front garden; and associated external alterations.
2-6 Stanhope Row; 16 Stanhope Row 36 And 37 Hertford Street 16a, 16B And 17 Market Mews
Demolition and replacement of existing fifth floor, demolition of existing plant room, and erection of a single storey roof extension at sixth floor to 2-6 Stanhope Row with replacement windows, terraces at fifth and sixth floors and remodelling works; demolition of 16 Stanhope Row, 16a, 16b and 17 Market Mews, excavation at basement level and erection of a four-storey (plus part basement floor) replacement building, all to provide an 82-bedroom hotel (Class C1). Demolition of 37 Hertford Street and erection of replacement building (basement to fourth floor mansard roof plus rooftop plant enclosure); and Internal and external alterations to 36 Hertford Street including demolition and remodelling of existing mansard roof; together with excavation at basement level to 36 and 37 Hertford Street to lower existing basement slab level; all to provide 16 residential dwellings (Class C3) along with provision for cycle parking, terraces, refuse storage and rooftop plant, together with other associated works.
The National Gallery Trafalgar Square London WC2N 5DN
Remodelling of external gates, replacement glazing and adaption and enclosure of the loggia of the Sainsbury Wing. External alterations to the Wilkins Building, including alterations and part removal of railings, lawn and wall, with new entrance on Trafalgar Square to the Research Centre and Members Room. New basement link under Jubilee Walk, including excavation. Public realm works to the north of Trafalgar Square and Jubilee Walk, including new paving, benches, bollards and planting. New window and external alterations to Pigott Education Centre on Orange Street.
39 Eaton Place London SW1X 8BX
External alterations including remodelling of fourth floor mansard, replacement of skylights at ground, new sliding access hatch skylight to roof, replacement timber doors at ground and at basement level and to the vaults, reinstatement of Portland stone to the entrance steps, external entrance and vault doors to ground and lower ground.
Times Place 45 Pall Mall London SW1Y 5JG
External alterations to the building including: alterations to the front facade; replacement entrance, shopfront and canopy; remodelling of the rear facade at the sixth and seventh floors; installation of roof terraces at the sixth floor, seventh floor and at roof level; extension of lift shaft to roof level; new plant enclosure; lightwell infill; and associated external works in connection with the ongoing use of the building as offices (Class E).
Fifth Floor 1 Catherine Place London SW1E 6DX
Remodelling of existing single storey extension at fifth floor level and associated alterations.